planningalerts-scrapers / nsw_planning_major_projects

NSW Department of Planning Major Project Assessments


Scrapes major project assessments in NSW. These are development applications for larger projects and many are assessed as part of the controversial Part 3A planning laws.

This scraper is used by PlanningAlerts

Contributors mlandauer

Last run failed with status code 1.

Console output of last run

Injecting configuration and compiling... Injecting scraper and running... scraper.rb:5:in `<main>': iconv will be deprecated in the future, use String#encode instead. /app/vendor/ruby-1.9.3/lib/ruby/1.9.1/net/http.rb:763:in `initialize': Connection timed out - connect(2) (Errno::ETIMEDOUT) from /app/vendor/ruby-1.9.3/lib/ruby/1.9.1/net/http.rb:763:in `open' from /app/vendor/ruby-1.9.3/lib/ruby/1.9.1/net/http.rb:763:in `block in connect' from /app/vendor/ruby-1.9.3/lib/ruby/1.9.1/timeout.rb:55:in `timeout' from /app/vendor/ruby-1.9.3/lib/ruby/1.9.1/timeout.rb:100:in `timeout' from /app/vendor/ruby-1.9.3/lib/ruby/1.9.1/net/http.rb:763:in `connect' from /app/vendor/ruby-1.9.3/lib/ruby/1.9.1/net/http.rb:756:in `do_start' from /app/vendor/ruby-1.9.3/lib/ruby/1.9.1/net/http.rb:745:in `start' from /app/vendor/ruby-1.9.3/lib/ruby/1.9.1/net/http.rb:454:in `get_response' from scraper.rb:12:in `<main>'

Data

Downloaded 6440 times by openaustralia LoveMyData dcalde mlandauer DevAppProject jesse-a-reilly WilliamYun TheZepto nadavalon2 muzzie86 vietbaracon uncoverRiley CravenA N-2-O ljnicol odnagroup JPHePlanning Georeports nkavadias YogeshwarPatel yourneighbourhood Jedwards157

To download data sign in with GitHub

Download table (as CSV) Download SQLite database (1.04 MB) Use the API

rows 10 / 1348

date_scraped description info_url address council_reference on_notice_from on_notice_to comment_url
2011-03-23 07:26:18
An 'Amended Preferred Project' for the Orchard Hills Waste Project for consideration by the Land and Environment Court of NSW.
123 - 129 Patons Lane , Orchard Hills Penrith City Council
MP09_0074 and L & E Court Case No: 10928 of 2010
22/02/2011
23/03/2011
2011-03-23 07:26:21
Proposed drinking water and wastewater lead-in infrastructure, including a one kilometre long water pipeline and 1.5 kilometre long wastewater pipeline, to service the early release of the West Horsley Precinct, within West Dapto Urban Release Area.
West Dapto urban release area Shellharbour City Council Wollongong City Council
MP 10_0197
02/03/2011
31/03/2011
2011-03-23 07:26:28
The Concept Plan application is for the development of a water theme park known as Wet 'n' Wild Sydney, Reservoir Road, Prospect. The application comprises three stages and seeks approval for the design construction and operation of Stages 1 and 2 which include: - Site preparation works including earthworks, demolition and tree removal; - Water theme park rides and attractions; - Ancillary park support facilities; - Landscaping; - Access and parking; - Water cycle management; - Utility servicing; and - Signage The application also seeks approval for a Complying Development Code for the future development of Stage 3 of the water theme park.
Reservoir Road, Prospect Blacktown City Council
MP10_0190
23/02/2011
25/03/2011
2011-03-16 07:21:31
150 MW photovoltaic solar farm, with grid connection to the Moree substation
8 km south of Moree Airport, east of Northern Tablelands Explorer Rail Line and the Newell highway , Moree Moree Plains Shire Council
MP 10_0175
16/02/2011
18/03/2011
2011-03-16 07:21:41
Concept Plan Application for staged development comprising the conservation and refurbishment of the Graythwaite House, parking and access improvements, development of additional buildings and associated demolition.
20 Edward Street , North Sydney North Sydney Council
MP 10_0149
27/01/2011
14/03/2011
2011-03-16 07:21:51
Stage 1 Project Application - Conservation and refurbishment works to existing buildings, stormwater improvements, landscaping, parking and access improvements.
20 Edward Street , North Sydney North Sydney Council
MP 10_0150
27/01/2011
14/03/2011
2011-03-09 05:27:57
Project Application for five residential apartment buildings ranging from 6-25 storeys in height, ground floor retail to Walker Street, new public open space and basement parking at sites '2A' and '3A'.
40 Walker Street , Rhodes Canada Bay City Council
MP10_0105
15/12/2010
11/02/2011
2011-03-16 07:21:54
The construction of a two storey hospital building for the Mental Health Intensive Care Unit at the Prince of Wales Hospital Campus. The proposal comprises 12 inpatient beds, work spaces, communal areas, ambulance bay, meeting rooms and Magistrate’s room, parking for two service vehicles, associated landscaping and road works to extend Simeon Pearce Drive.
High Street , Avoca Street , Randwick Randwick City Council
MP 10_0131
09/02/2011
11/03/2011
2011-03-23 07:26:36
Concept plan for development of the Black Hill site for industrial and employment generating uses
F3 Freeway , Newcastle Newcastle City Council
MP10_0093
02/03/2011
01/04/2011
2011-03-23 07:26:42
Concept Plan for urban development (up to 3,300 dwellings and 2 mixed use centres) at Minmi, Newcastle Link Road, and dedication of 1,561 hectares of conservation lands, at Stockrington and associated infrastructure.
Link Road , Newcastle Cessnock City Council Lake Macquarie City Council Newcastle City Council
MP10_0090
02/03/2011
01/04/2011

Statistics

Average successful run time: less than a minute

Total run time: 4 days

Total cpu time used: about 2 hours

Total disk space used: 1.07 MB

History

  • Auto ran revision 64506bea and failed .
    nothing changed in the database
  • Auto ran revision 64506bea and failed .
    nothing changed in the database
  • Auto ran revision 64506bea and failed .
    nothing changed in the database
  • Auto ran revision 64506bea and failed .
    nothing changed in the database
  • Auto ran revision 64506bea and failed .
    nothing changed in the database
  • ...
  • Created on morph.io

Show complete history