planningalerts-scrapers / moreton_bay_qld

Moreton Bay Regional Council Scraper


Contributors mlandauer

Last run completed successfully .

Console output of last run

Injecting configuration and compiling...  -----> Ruby app detected -----> Compiling Ruby -----> Using Ruby version: ruby-2.5.8 -----> Installing dependencies using bundler version 1.15.2  Running: bundle install --without development:test --path vendor/bundle --binstubs vendor/bundle/bin -j4 --deployment  Warning: the running version of Bundler (1.15.2) is older than the version that created the lockfile (1.17.3). We suggest you upgrade to the latest version of Bundler by running `gem install bundler`.  Fetching gem metadata from https://rubygems.org/...........  Fetching version metadata from https://rubygems.org/.  Fetching https://github.com/openaustralia/scraperwiki-ruby.git  Using bundler 1.15.2  Fetching mime-types-data 3.2021.0225  Fetching multi_xml 0.6.0  Fetching httpclient 2.8.3  Installing multi_xml 0.6.0  Installing mime-types-data 3.2021.0225  Installing httpclient 2.8.3  Fetching sqlite3 1.4.2  Installing sqlite3 1.4.2 with native extensions  Fetching mime-types 3.3.1  Installing mime-types 3.3.1  Fetching httparty 0.18.1  Installing httparty 0.18.1  Fetching sqlite_magic 0.0.6  Installing sqlite_magic 0.0.6  Using scraperwiki 3.0.1 from https://github.com/openaustralia/scraperwiki-ruby.git (at morph_defaults@fc50176)  Bundle complete! 2 Gemfile dependencies, 9 gems now installed.  Gems in the groups development and test were not installed.  Bundled gems are installed into ./vendor/bundle.  Post-install message from httparty:  When you HTTParty, you must party hard!  Bundle completed (7.71s)  Cleaning up the bundler cache.  Warning: the running version of Bundler (1.15.2) is older than the version that created the lockfile (1.17.3). We suggest you upgrade to the latest version of Bundler by running `gem install bundler`. -----> Detecting rake tasks   -----> Discovering process types  Procfile declares types -> scraper Injecting scraper and running...

Data

Downloaded 836 times by dcalde openaustralia MrPenquin krynens jordanmusk

To download data sign in with GitHub

Download table (as CSV) Download SQLite database (921 KB) Use the API

rows 10 / 2208

council_reference address description info_url date_scraped date_received
DA/2021/1512
4-16 Station Street SAMFORD VILLAGE QLD 4520
Request to Extend the Currency Period - Reconfiguring a Lot - Development Permit for Subdivision (8 into 2 lots) and Material Change of Use - Development Permit for Shop, Office and Medium Density Multiple Dwelling (6 Units)
2021-05-14
2021-04-16
DA/2021/1511
2-6 Reynolds Court BURPENGARY EAST QLD 4505
Request to Change (Other) - Material Change of Use - Development Permit for Low Impact Industry
2021-05-14
2021-04-16
DA/2021/1509
49 Spring Lane CABOOLTURE QLD 4510
Operational Work - Development Permit for Roadwork, Stormwater, Earthworks and Vegetation Clearing
2021-05-14
2021-04-16
DA/2021/1505
136 Mountaintrack Drive WAMURAN QLD 4512
Building Works - Development Permit for Domestic Outbuilding (Setbacks and Height Overlay) - assessed against the Planning Scheme
2021-05-14
2021-04-16
DA/2021/1504
27 Redgum Drive BURPENGARY QLD 4505
Concurrence Agency Response for Domestic Outbuilding (Shed & Carport)
2021-05-14
2021-04-16
DA/2021/1550
8 Altona Street NEWPORT QLD 4020
Material Change of Use - Development Permit for Dwelling House
2021-05-14
2021-04-16
DA/2021/1500
4 Homestead Court DAYBORO QLD 4521
Building Works - Development Permit for Secondary Dwelling (Bushfire Hazard Overlay & Landslide Overlay)
2021-05-14
2021-04-16
DA/2021/1498
13 Carter Court DECEPTION BAY QLD 4508
Reconfiguring a Lot - Development Permit for Subdivision (1 into 2 lots and Access Easement)
2021-05-14
2021-04-16
DA/2021/1537
1 Mabel Street MARGATE QLD 4019
Request to Change (Minor) - Reconfiguring a Lot - Development Permit for Subdivision (1 into 2 lots)
2021-05-17
2021-04-19
DA/2021/1535
79 Burpengary Road BURPENGARY QLD 4505
Operational Works - Development Permit for Roadworks, Drainage Work, Earthworks and Stormwater (Stage 2)
2021-05-17
2021-04-19

Statistics

Average successful run time: half a minute

Total run time: about 4 hours

Total cpu time used: 6 minutes

Total disk space used: 945 KB

History

  • Auto ran revision 3cd6fbd7 and completed successfully .
    178 records added, 171 records removed in the database
  • Auto ran revision 3cd6fbd7 and completed successfully .
    179 records added, 172 records removed in the database
  • Auto ran revision 3cd6fbd7 and completed successfully .
    182 records added, 170 records removed in the database
  • Auto ran revision 3cd6fbd7 and completed successfully .
    170 records added, 170 records removed in the database
  • Auto ran revision 3cd6fbd7 and completed successfully .
    171 records added, 167 records removed in the database
  • ...
  • Created on morph.io

Show complete history

Scraper code

Ruby

moreton_bay_qld / scraper.rb