soit-sk / brno_sever_earthworks

Brno-Sever - Výkopové práce


This is a scraper that runs on Morph. To get started see the documentation

Scrape data about Brno-Sever - Výkopové práce

Contributors tupinek

Last run failed with status code 255.

Console output of last run

Injecting configuration and compiling...  -----> Perl/PSGI app detected -----> Bootstrapping cpanm  Successfully installed App-cpanminus-1.7042  1 distribution installed -----> Installing dependencies  Successfully installed JSON-2.90  Successfully installed Sub-Uplevel-0.2600  Successfully installed Test-Exception-0.43  Successfully installed Test-Pod-1.51  Successfully installed DBI-1.636  Successfully installed DBD-SQLite-1.50  Successfully installed Database-DumpTruck-1.2  Successfully installed HTML-Tagset-3.20  Successfully installed HTML-Parser-3.72  Successfully installed Try-Tiny-0.27  Successfully installed Test-Fatal-0.014  Successfully installed HTML-Tree-5.03  Successfully installed HTTP-Date-6.02  Successfully installed URI-1.71  Successfully installed Encode-Locale-1.05  Successfully installed IO-HTML-1.001  Successfully installed LWP-MediaTypes-6.02  Successfully installed HTTP-Message-6.11  Successfully installed File-Listing-6.04  Successfully installed Net-HTTP-6.09  Successfully installed HTTP-Cookies-6.01  Successfully installed HTTP-Negotiate-6.01  Successfully installed WWW-RobotRules-6.02  Successfully installed HTTP-Daemon-6.01  Successfully installed libwww-perl-6.15  Successfully installed XML-Parser-2.44  Successfully installed libxml-perl-0.08  Successfully installed XML-RegExp-0.04  Successfully installed XML-DOM-1.46  Successfully installed XML-NamespaceSupport-1.11  Successfully installed XML-SAX-Base-1.08  Successfully installed XML-SAX-0.99  Successfully installed XML-LibXML-2.0128  Successfully installed Mozilla-CA-20160104  Successfully installed Net-SSLeay-1.78  Successfully installed IO-Socket-SSL-2.038  Successfully installed LWP-Protocol-https-6.06  Successfully installed Text-CSV-1.33  Successfully installed XML-SAX-Expat-0.51  Successfully installed Path-Tiny-0.096  Successfully installed XML-XPath-1.37  Successfully installed Canary-Stability-2012  Successfully installed common-sense-3.74  Successfully installed Types-Serialiser-1.0  Successfully installed JSON-XS-3.02  Successfully installed XML-Simple-2.22  Successfully installed Text-CSV_XS-1.25  Successfully installed File-Slurp-9999.19  Successfully installed HTML-Form-6.03  49 distributions installed -----> Installing Starman  Successfully installed ExtUtils-Helpers-0.026  Successfully installed ExtUtils-Config-0.008  Successfully installed ExtUtils-InstallPaths-0.011  Successfully installed Test-Harness-3.36  Successfully installed Module-Build-Tiny-0.039  Successfully installed IO-Socket-IP-0.38  Successfully installed Test-SharedFork-0.35  Successfully installed Test-TCP-2.17  Successfully installed Net-Server-2.008  Successfully installed File-ShareDir-Install-0.11  Successfully installed HTTP-Tiny-0.068 (upgraded from 0.025)  Successfully installed WWW-Form-UrlEncoded-0.23  Successfully installed Devel-StackTrace-2.01  Successfully installed Devel-StackTrace-AsHTML-0.15  Successfully installed Class-Inspector-1.28  Successfully installed File-ShareDir-1.102  Successfully installed POSIX-strftime-Compiler-0.42  Successfully installed Apache-LogFormat-Compiler-0.33  Successfully installed Hash-MultiValue-0.16  Successfully installed Stream-Buffered-0.03  Successfully installed JSON-PP-2.27400 (upgraded from 2.27202)  Successfully installed JSON-MaybeXS-1.003008  Successfully installed Test-Deep-1.123  Successfully installed HTTP-MultiPartParser-0.01  Successfully installed HTTP-Entity-Parser-0.18  Successfully installed HTTP-Headers-Fast-0.20  Successfully installed Cookie-Baker-0.07  Successfully installed Filesys-Notify-Simple-0.12  Successfully installed Plack-1.0042  Successfully installed Data-Dump-1.23  Successfully installed HTTP-Parser-XS-0.17  Successfully installed Starman-0.4014  32 distributions installed  -----> Discovering process types  Procfile declares types -> scraper Injecting scraper and running... Page: http://www.sever.brno.cz/omezeni-dopravy/92-vykopove-prace.html Can't call method "as_text" on an undefined value at scraper.pl line 71.

Data

Downloaded 1 time by MikeRalphson

To download data sign in with GitHub

Download table (as CSV) Download SQLite database (10 KB) Use the API

rows 10 / 20

Description Page_link Start_date Title
Od 14. 7. 2014 do cca 14. 9. 2014 bude uzavřena ul. Musilova (č. 2 - 10) z důvodu opravy havárie kanalizace.
2014-07-14
Uzavírka ulice Musilova
V termínu od 11. 7. 2014 do 15. 9. 2014 je úplně uzavřena ulice Klidná z důvodu rekonstrukce plynovodu a plynovodních přípojek.
2014-07-07
Uzavírka ulice Klidná
V termínu od 12. 5. 2014 do 15. 9. 2014 je uzavřena ulice Slezákova z důvodu stavby Rekonstrukce plynovodu a přípojek. Jedná se o částečnou uzavírku s jednosměrným provozem z ul. Kohoutova.
2014-05-05
Uzavírka ulice Slezákova
Od 8. 4. 2014 do 30. 9. 2014 bude na ulicích Liliová, Kosatcová a Dřínová probíhat rekonstrukce plynovodu a přípojek.
2014-04-07
Uzavírka ulic Liliová, Kosatcová a Dřínová
Od 15. 3. 2014 do 30.6. 2015 je z důvodu realizace stavby Rekonstrukce kanalizace a vodovodu uzavřena ulice Milady Horákové.
2014-03-17
Uzavírka ulice Milady Horákové
Od 18. 11. 2013 do 30. 11. 2014 probíhá celková uzavírka ulice Alešova z důvodu stavebních prací na rekonstrukci kanalizace a vodovodu.
2013-11-21
Uzavírka ulice Alešova
Od 27. 10. 2014 do 30. 11. 2014 bude uzavřena ul. náměstí SNP mezi ul. Mathonova a Janouškova z důvodu rekonstrukce povrchu vozovky a opravy obrubníků a stávajícího chodníku. Průjezd z ul. Mathonova na ul. Bieblova zajištěn. Objízdná trasa na náměstí SNP je po ul. Fügnerova.
2014-10-21
Uzavírka náměstí SNP
Od 20. 10. 2014 do 21. 11. 2014 je částečně uzavřena ulice Provazníkova v úseku od křižovatky s ul. Lesnickou za křižovatku s ul. Mathonovou ve směru od centra města z důvodu prací na stavbě "Brno-Provazníkova, oprava kanalizace, úsek stavby Lesnická - Mathonova".Stavba probíhá ve dvou etapách. I. etapa od 20. 10. 2014 do 14. 11. 2014 úsek od křižovatky s ul. Lesnickou před křižovatku s ul. Mathonovou. II. etapa od 15. 11. 2014 do 21. 11. 2014 úsek křižovatky s ul. Mathonovou.
2014-10-21
Uzavírka ulice Provazníkova
Od 1. 10. 2014 do 30. 11. 2014 se provádějí výkopové práce na ul. Černopolní v úseku Merhautova-Francouzská na stavbě Oprava havarijního stavu plynovodu a přípojek.
2014-10-01
Ulice Černopolní
Z důvodu realizace stavby "Brno Alešova, Merhautova II - oprava vodovodu" budou v termínu od 18. 8. 2014 do 15. 11. 2014 probíhat výkopové práce na ul. Merhautova a Fügnerova. Ulice Fügnerova bude uzavřena, objízdná trasa bude po ul. Merhautova, Provazníkova, Mathonova, nám. SNP, Janouškova.
2014-08-07
Uzavírka ulice Fügnerova

Statistics

Average successful run time: less than 20 seconds

Total run time: 4 minutes

Total cpu time used: less than 5 seconds

Total disk space used: 31.3 KB

History

  • Manually ran revision cbcc741f and failed .
    nothing changed in the database
  • Manually ran revision cbcc741f and completed successfully .
    8 records added in the database
    1 page scraped
  • Manually ran revision cbcc741f and completed successfully .
    6 records added in the database
  • Manually ran revision cbcc741f and completed successfully .
    6 records added in the database
  • Created on morph.io

Scraper code

Perl

brno_sever_earthworks / scraper.pl