loren / ustda_data

USTDA (United States Trade and Development Agency) Trade Leads

Scrapes www.ustda.gov

USTDA.gov


This is a scraper of USTDA Trade Leads data that runs on Morph. It joins two separate XML feeds into one JSON feed.

Contributors loren

Last run completed successfully .

Console output of last run

Injecting configuration and compiling...  -----> Ruby app detected -----> Compiling Ruby -----> Using Ruby version: ruby-2.2.5 -----> Installing dependencies using bundler 1.15.2  Running: bundle install --without development:test --path vendor/bundle --binstubs vendor/bundle/bin -j4 --deployment  Fetching gem metadata from https://rubygems.org/...........  Fetching version metadata from https://rubygems.org/.  Fetching https://github.com/openaustralia/scraperwiki-ruby.git  Using bundler 1.15.2  Fetching crass 1.0.2  Fetching htmlentities 4.3.4  Fetching json 1.8.3  Installing htmlentities 4.3.4  Installing crass 1.0.2  Installing json 1.8.3 with native extensions  Fetching multi_xml 0.5.5  Fetching httpclient 2.6.0.1  Installing multi_xml 0.5.5  Fetching mini_portile2 2.1.0  Installing mini_portile2 2.1.0  Installing httpclient 2.6.0.1  Fetching pkg-config 1.1.7  Installing pkg-config 1.1.7  Fetching sqlite3 1.3.10  Installing sqlite3 1.3.10 with native extensions  Fetching nokogiri 1.6.8  Installing nokogiri 1.6.8 with native extensions  Fetching sqlite_magic 0.0.3  Installing sqlite_magic 0.0.3  Using scraperwiki 3.0.1 from https://github.com/openaustralia/scraperwiki-ruby.git (at morph_defaults@fc50176)  Fetching nokogumbo 1.4.7  Installing nokogumbo 1.4.7 with native extensions  Fetching sanitize 4.0.1  Fetching httparty 0.13.7  Installing sanitize 4.0.1  Installing httparty 0.13.7  Bundle complete! 4 Gemfile dependencies, 15 gems now installed.  Gems in the groups development and test were not installed.  Bundled gems are installed into ./vendor/bundle.  Post-install message from httparty:  When you HTTParty, you must party hard!  Bundle completed (26.54s)  Cleaning up the bundler cache. -----> Detecting rake tasks   -----> Discovering process types  Procfile declares types -> scraper Injecting scraper and running... {:title=>"Nigeria: Bid Rounds for 30 Marginal Oil Fields", :publish_date=>"2017-08-30", :end_date=>nil, :description=>"Background: The Nigerian National Petroleum Corporation (NNPC) announced that the federal government will soon open bids to concession 30 marginal oil fields in Nigeria. This project represents an opportunity for U.S. oil and gas firms to work closely with local companies operating in the upstream subsector, where U.S. technologies and expertise can help advance Nigeria’s energy goals. NNPC officials note that firms would need to engage Nigeria’s regulator, the Department of Petroleum Resources (DPR), to ensure that conditions for oil field leasing aligns with federal regulations. Link for more information: http://www.nnpcgroup.com/PublicRelations/NNPCinthenews/tabid/92/articleType/ArticleView/articleId/838/NNPC-Tasks-Indigenous-Companies-to-Bid-for-30-Marginal-Fields.aspx Proposal Deadline: Specific information about bid rounds are still forthcoming and USTDA will monitor and publish updates as information becomes available. Point of Contact: Josh Egba Business Development Specialist, USTDA Lagos, Nigeria jegba@ustda.gov", :url=>"https://www.ustda.gov/business-opportunities/trade-leads/nigeria-bid-rounds-30-marginal-oil-fields"} {:title=>"Cameroon: 365MW Hydroelectric Project", :publish_date=>"2017-10-17", :end_date=>nil, :description=>"Background: Platinum Power, a Power Africa partner, has pre-qualified a total of 7 consortia for the design and build of one of their hydropower projects in Cameroon, the Makay Hydroelectric project. This project has an expected installed capacity of 365 MW and is located on the Nyong River, in the Nyong-et-Kelle Department, Central region of the Republic of Cameroon. The following candidates have been prequalified: Acciona Construction / Acciona Industrial / Cooperativa Muratori Cementisti Ravenna; Andrade Gutierrez Engenharia S.A / Andrade Gutierrez Europa, Africa, Asia S.A / Construtora Barbosa Mello SA; China Ghezouba Group Company / China Energy Engineering Corporation; China State Construction Engineering Corporation / Pearl River Planning Surveying & Designing Company; Mota Engil Africa NGE Contracting / Besix / SGTM; Sinohydro / Power China. This project represents several opportunities for U.S. companies to join any of the selected consortia, in preparation of the upcoming international tender. Link for more information: Click Here Proposal Deadline: No deadline has been posted yet, but the listed consortia will be invited to bid on the final tender, scheduled for launch in the coming weeks. Point of Contact: All questions should be directed to: Ms. Thanae Bennani T.bennani@platinumpower.ma Phone: +212 (0) 661 41 7826 This trade lead is provided courtesy of Power Africa. To receive more information on tender and procurement opportunities in the power generation space in sub-Saharan Africa, please sign up for Power Africa's newsletter here. Because this is not a USTDA coordinated/funded procurement, please direct all questions on this project to the contact listed above.", :url=>"https://www.ustda.gov/business-opportunities/trade-leads/cameroon-365mw-hydroelectric-project"} {:title=>"Côte d’Ivoire: Hydropower Facilities Implementation", :publish_date=>"2017-10-19", :end_date=>nil, :description=>"Background: Platinum Power, a Power Africa partner, has pre-qualified a total of 6 consortia for the design and construction of their hydropower projects in Côte d’Ivoire. These include the hydropower plant of Gao, with an expected output of 150 MW, located on the Bafing River and the hydropower plant of Tayaboui, with an expected output of 150 MW, located on the Sassandra River. The pre-qualified consortia include: Andrade Gutierrez Engenharia, Andrade Gutierrez Europa Africa Asia, Construtora Barbosa Mello China Gezhouba Group Company (CGGC) Cooperativa Muratori e Cimentisti (CMC) Eiffage Génie Civil, Acciona Construcción, Acciona Industrial Mota Engil Engenharia e Construçao Africa, Coba , Efacec Engenharia e Sistemas Power Construction Corporation of China (Power China) This project represents several opportunities for U.S. companies to join any of the selected consortia, in preparation of the upcoming international tender. Link for more information: Click Here Proposal Deadline: No deadline has been posted yet, but the listed consortia will be invited to bid on the final tender, scheduled for launch in the coming weeks. Point of Contact: All questions should be directed to: Ms. Thanae Bennani T.bennani@platinumpower.ma Phone: +212 (0) 661 41 7826 This trade lead is provided courtesy of Power Africa. To receive more information on tender and procurement opportunities in the power generation space in sub-Saharan Africa, please sign up for Power Africa's newsletter here. Because this is not a USTDA coordinated/funded procurement, please direct all questions on this project to the contact listed above.", :url=>"https://www.ustda.gov/business-opportunities/trade-leads/c%25C3%25B4te-d%25E2%2580%2599ivoire-hydropower-facilities-implementation"} {:title=>"Long Thanh International Airport Survey and Feasibility Study – Phase 1", :publish_date=>"2017-12-20", :end_date=>"2018-02-23", :description=>"Background: Airports Corporation of Vietnam (ACV) is accepting bids for the survey and feasibility study for Phase 1 of Long Thanh International Airport’s development. Long Thanh International Airport is planned for construction in Long Thành, Đồng Nai Province, approximately 25 miles east of Ho Chi Minh City. Implementation of the contract for Phase 1 is expected to last 540 days (18 months). Link for more information: Invitation to Bid and Scope of Design. Proposal Deadline: 23 February 2018, 09:00 Ho Chi Minh City Local Time Point of Contact: Mr. Dao Viet Dung Member of Board of Directors Airports Corporation of Vietnam (ACV) Long Thanh International Airport Project Management Unit Level 4, ACV Building 58 Truong Son St., Ward 2, Tan Binh District, Ho Chi Minh City, Vietnam Email: vietdung@vietnamairport.vn Tel: +84 28 3848 8952", :url=>"https://www.ustda.gov/business-opportunities/trade-leads/long-thanh-international-airport-survey-and-feasibility-study-%25E2%2580%2593"}

Data

Downloaded 553 times by loren davidpranata

To download data sign in with GitHub

Download table (as CSV) Download SQLite database (29 KB) Use the API

rows 4 / 4

title publish_date end_date description url
Nigeria: Bid Rounds for 30 Marginal Oil Fields
2017-08-30
Background: The Nigerian National Petroleum Corporation (NNPC) announced that the federal government will soon open bids to concession 30 marginal oil fields in Nigeria. This project represents an opportunity for U.S. oil and gas firms to work closely with local companies operating in the upstream subsector, where U.S. technologies and expertise can help advance Nigeria’s energy goals. NNPC officials note that firms would need to engage Nigeria’s regulator, the Department of Petroleum Resources (DPR), to ensure that conditions for oil field leasing aligns with federal regulations. Link for more information: http://www.nnpcgroup.com/PublicRelations/NNPCinthenews/tabid/92/articleType/ArticleView/articleId/838/NNPC-Tasks-Indigenous-Companies-to-Bid-for-30-Marginal-Fields.aspx Proposal Deadline: Specific information about bid rounds are still forthcoming and USTDA will monitor and publish updates as information becomes available. Point of Contact: Josh Egba Business Development Specialist, USTDA Lagos, Nigeria jegba@ustda.gov
Cameroon: 365MW Hydroelectric Project
2017-10-17
Background: Platinum Power, a Power Africa partner, has pre-qualified a total of 7 consortia for the design and build of one of their hydropower projects in Cameroon, the Makay Hydroelectric project. This project has an expected installed capacity of 365 MW and is located on the Nyong River, in the Nyong-et-Kelle Department, Central region of the Republic of Cameroon. The following candidates have been prequalified: Acciona Construction / Acciona Industrial / Cooperativa Muratori Cementisti Ravenna; Andrade Gutierrez Engenharia S.A / Andrade Gutierrez Europa, Africa, Asia S.A / Construtora Barbosa Mello SA; China Ghezouba Group Company / China Energy Engineering Corporation; China State Construction Engineering Corporation / Pearl River Planning Surveying & Designing Company; Mota Engil Africa NGE Contracting / Besix / SGTM; Sinohydro / Power China. This project represents several opportunities for U.S. companies to join any of the selected consortia, in preparation of the upcoming international tender. Link for more information: Click Here Proposal Deadline: No deadline has been posted yet, but the listed consortia will be invited to bid on the final tender, scheduled for launch in the coming weeks. Point of Contact: All questions should be directed to: Ms. Thanae Bennani T.bennani@platinumpower.ma Phone: +212 (0) 661 41 7826 This trade lead is provided courtesy of Power Africa. To receive more information on tender and procurement opportunities in the power generation space in sub-Saharan Africa, please sign up for Power Africa's newsletter here. Because this is not a USTDA coordinated/funded procurement, please direct all questions on this project to the contact listed above.
Côte d’Ivoire: Hydropower Facilities Implementation
2017-10-19
Background: Platinum Power, a Power Africa partner, has pre-qualified a total of 6 consortia for the design and construction of their hydropower projects in Côte d’Ivoire. These include the hydropower plant of Gao, with an expected output of 150 MW, located on the Bafing River and the hydropower plant of Tayaboui, with an expected output of 150 MW, located on the Sassandra River. The pre-qualified consortia include: Andrade Gutierrez Engenharia, Andrade Gutierrez Europa Africa Asia, Construtora Barbosa Mello China Gezhouba Group Company (CGGC) Cooperativa Muratori e Cimentisti (CMC) Eiffage Génie Civil, Acciona Construcción, Acciona Industrial Mota Engil Engenharia e Construçao Africa, Coba , Efacec Engenharia e Sistemas Power Construction Corporation of China (Power China) This project represents several opportunities for U.S. companies to join any of the selected consortia, in preparation of the upcoming international tender. Link for more information: Click Here Proposal Deadline: No deadline has been posted yet, but the listed consortia will be invited to bid on the final tender, scheduled for launch in the coming weeks. Point of Contact: All questions should be directed to: Ms. Thanae Bennani T.bennani@platinumpower.ma Phone: +212 (0) 661 41 7826 This trade lead is provided courtesy of Power Africa. To receive more information on tender and procurement opportunities in the power generation space in sub-Saharan Africa, please sign up for Power Africa's newsletter here. Because this is not a USTDA coordinated/funded procurement, please direct all questions on this project to the contact listed above.
Long Thanh International Airport Survey and Feasibility Study – Phase 1
2017-12-20
2018-02-23
Background: Airports Corporation of Vietnam (ACV) is accepting bids for the survey and feasibility study for Phase 1 of Long Thanh International Airport’s development. Long Thanh International Airport is planned for construction in Long Thành, Đồng Nai Province, approximately 25 miles east of Ho Chi Minh City. Implementation of the contract for Phase 1 is expected to last 540 days (18 months). Link for more information: Invitation to Bid and Scope of Design. Proposal Deadline: 23 February 2018, 09:00 Ho Chi Minh City Local Time Point of Contact: Mr. Dao Viet Dung Member of Board of Directors Airports Corporation of Vietnam (ACV) Long Thanh International Airport Project Management Unit Level 4, ACV Building 58 Truong Son St., Ward 2, Tan Binh District, Ho Chi Minh City, Vietnam Email: vietdung@vietnamairport.vn Tel: +84 28 3848 8952

Statistics

Average successful run time: less than a minute

Total run time: about 8 hours

Total cpu time used: 10 minutes

Total disk space used: 54.8 KB

History

  • Auto ran revision 42f43698 and completed successfully .
    nothing changed in the database
    2 pages scraped
  • Auto ran revision 42f43698 and completed successfully .
    nothing changed in the database
    28 pages scraped
  • Auto ran revision 42f43698 and completed successfully .
    1 record removed, 1 record updated in the database
    2 pages scraped
  • Auto ran revision 42f43698 and failed .
    nothing changed in the database
  • Auto ran revision 42f43698 and failed .
    nothing changed in the database
  • ...
  • Created on morph.io

Show complete history

Scraper code

Ruby

ustda_data / scraper.rb