ErinClark / td_EBRD

Scrapes www.ebrd.com, www.google-analytics.com, fonts.googleapis.com, and 2 other domains

The European Bank for Reconstruction and Development (EBRD) helps businesses flourish. Through our financial investments, business services and involvement in high-level policy dialogue, we're well-placed to promote entrepreneurship and change lives.


This is a scraper that runs on Morph. To get started see the documentation

Contributors ErinClark randomgitman

Last run completed successfully .

Console output of last run

Injecting configuration and compiling... Injecting scraper and running... http://www.ebrd.com/work-with-us/procurement/notices.html http://www.ebrd.com/work-with-us/procurement/notices.html http://www.ebrd.com/work-with-us/procurement/notices.html http://www.ebrd.com/work-with-us/procurement/notices.html http://www.ebrd.com/work-with-us/procurement/p-pn-161208a.html 8485-GPN-46795 http://www.ebrd.com/work-with-us/procurement/pn-67334.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-161207b.html 8484-GPN-48089 http://www.ebrd.com/work-with-us/procurement/p-pn-161207a.html 8483-IFT-46112 http://www.ebrd.com/work-with-us/procurement/p-pn-161206a.html 8482-GPN-47981 http://www.ebrd.com/work-with-us/procurement/pn-66834.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-161205a.html 8481-IFT-47902 http://www.ebrd.com/work-with-us/procurement/p-pn-161202c.html 8480-EOI-40185 http://www.ebrd.com/work-with-us/procurement/p-pn-161202b.html 8479-IFT-43597 http://www.ebrd.com/work-with-us/procurement/p-pn-161202a.html 8478-IFT-43597 http://www.ebrd.com/work-with-us/procurement/pn-67350.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-67135.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-67338.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-67378.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-66426.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-161201d.html 8477-GPN-40185 http://www.ebrd.com/work-with-us/procurement/p-pn-161201c.html 8476-IFT-43597 http://www.ebrd.com/work-with-us/procurement/p-pn-161201b.html 8475-IFT-43597 http://www.ebrd.com/work-with-us/procurement/p-pn-161201a.html 8474-IFT-43597 http://www.ebrd.com/work-with-us/procurement/p-pn-events-management-company.html PUR1609/13 http://www.ebrd.com/work-with-us/procurement/p-pn-67151.html 67151 http://www.ebrd.com/work-with-us/procurement/p-pn-161130c.html 8473-PRE-48820 http://www.ebrd.com/work-with-us/procurement/p-pn-161130b.html 8472-EOI-48820 http://www.ebrd.com/work-with-us/procurement/p-pn-161130a.html 8471-PRE-42232 http://www.ebrd.com/work-with-us/procurement/pn-67013.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-kyzyl-kiya-water-sub-project-.html 671 http://www.ebrd.com/work-with-us/procurement/pn-67179.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-67244.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-161125b.html 8470-GPN-43094 http://www.ebrd.com/work-with-us/procurement/p-pn-161125a.html 8469-IFT-44129 http://www.ebrd.com/work-with-us/procurement/p-pn-67284.html 67284 http://www.ebrd.com/work-with-us/procurement/p-pn-67279.html 67279 http://www.ebrd.com/work-with-us/procurement/p-pn-161123a.html 8468-IFT-43465 http://www.ebrd.com/work-with-us/procurement/pn-67206.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-67142.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-67092.html 67092 http://www.ebrd.com/work-with-us/procurement/p-pn-161121a.html 8467-IFT-47537 http://www.ebrd.com/work-with-us/procurement/p-pn-161118a.html 8466-IFT-45213 http://www.ebrd.com/work-with-us/procurement/p-pn-161116b.html 8464-IFT-42086 http://www.ebrd.com/work-with-us/procurement/p-pn-161116a.html 8463-IFT-42086 http://www.ebrd.com/work-with-us/procurement/p-pn-161115a.html 8462-EOI-40185 http://www.ebrd.com/work-with-us/procurement/p-pn-66765.html 66765 http://www.ebrd.com/work-with-us/procurement/p-pn-66425.html 66425 http://www.ebrd.com/work-with-us/procurement/p-pn-161114c.html 8461-IFT-47379 http://www.ebrd.com/work-with-us/procurement/p-pn-161114b.html 8460-IFT-42784 http://www.ebrd.com/work-with-us/procurement/p-pn-161114a.html 8459-EOI-42232 http://www.ebrd.com/work-with-us/procurement/p-pn-67058.html 67058 http://www.ebrd.com/work-with-us/procurement/p-pn-161111c.html 8458-GPN-48235 http://www.ebrd.com/work-with-us/procurement/p-pn-161111b.html 8457-GPN-48402 http://www.ebrd.com/work-with-us/procurement/p-pn-161109a.html 8455-GPN-48769 http://www.ebrd.com/work-with-us/procurement/pn-66860.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-66858.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-161107a.html 8454-IFT-47570 http://www.ebrd.com/work-with-us/procurement/p-pn-65931.html 65931 http://www.ebrd.com/work-with-us/procurement/p-pn-161104a.html 8453-GPN-46201 http://www.ebrd.com/work-with-us/procurement/p-pn-kazakhstan-dh-meter-installation-programme---piu.html 66900 http://www.ebrd.com/work-with-us/procurement/p-pn-kazakhstan-dh-meter-installation-programme---cdp.html 66902 http://www.ebrd.com/work-with-us/procurement/p-pn-kazakhstan-dh-meters-installation---ihs-installation.html 66903 http://www.ebrd.com/work-with-us/procurement/p-pn161102d.html 8452-IFT-44243 http://www.ebrd.com/work-with-us/procurement/p-pn-161102c.html 8451-IFT-43958 http://www.ebrd.com/work-with-us/procurement/p-pn-161102b.html 8450-IFT-43958 http://www.ebrd.com/work-with-us/procurement/p-pn-161101b.html 8448-IFT-46465 http://www.ebrd.com/work-with-us/procurement/p-pn-161101a.html 8447-IFT-41492 http://www.ebrd.com/work-with-us/procurement/p-pn-161031b.html 8446-GPN-43958 http://www.ebrd.com/work-with-us/procurement/p-pn-161031a.html 8445-GPN-48410 http://www.ebrd.com/work-with-us/procurement/pn-66678.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-161027a.html 8444- PRE-41553-47253 http://www.ebrd.com/work-with-us/procurement/p-pn-development-of-a-regional-business-registries-it-portal-.html 66723 http://www.ebrd.com/work-with-us/procurement/p-pn-161026a.html 8443-IFT-Other http://www.ebrd.com/work-with-us/procurement/p-pn-161025c.html 8442-IFT-43597 http://www.ebrd.com/work-with-us/procurement/p-pn-161025b.html 8441-GPN-47253 http://www.ebrd.com/work-with-us/procurement/p-pn-161025a.html 8440-IFT-47971 http://www.ebrd.com/work-with-us/procurement/p-pn-66784.html 66784 http://www.ebrd.com/work-with-us/procurement/p-pn-66785.html 66785 http://www.ebrd.com/work-with-us/procurement/p-pn-66764.html 66764 http://www.ebrd.com/work-with-us/procurement/p-pn-66763.html 66763 http://www.ebrd.com/work-with-us/procurement/p-pn-intranet-redesign-tender.html PUR1608/15 Intranet Redesign Project EBRD http://www.ebrd.com/work-with-us/procurement/p-pn-161021a.html 8436-IFT-44027 http://www.ebrd.com/work-with-us/procurement/p-pn-161021b.html 8437-IFT-42086 http://www.ebrd.com/work-with-us/procurement/p-pn-161018c.html 8435-IFT-46274 http://www.ebrd.com/work-with-us/procurement/p-pn-161018b.html 8434-IFT-44114 http://www.ebrd.com/work-with-us/procurement/p-pn-161018a.html 8433-IFT-44114 http://www.ebrd.com/work-with-us/procurement/visoko-water-supply---supervision-of-civil-works-on-construction.html 65189 http://www.ebrd.com/work-with-us/procurement/p-pn-161014a.html 8431- IFT-45645 http://www.ebrd.com/work-with-us/procurement/p-pn-161006c.html 8424-GPN-47396 http://www.ebrd.com/work-with-us/procurement/p-pn-161006b.html 8423-GPN-47497 http://www.ebrd.com/work-with-us/procurement/p-pn-161006a.html 8422-GPN-42664 http://www.ebrd.com/work-with-us/procurement/p-pn-161006d.html 8425-GPN-48466 http://www.ebrd.com/work-with-us/procurement/p-pn-66166.html 66166 http://www.ebrd.com/work-with-us/procurement/p-pn-66165.html 66165 http://www.ebrd.com/work-with-us/procurement/p-pn-161003a.html 8421-GPN-48820 http://www.ebrd.com/work-with-us/procurement/p-pn-66453.html 66453 http://www.ebrd.com/work-with-us/procurement/p-pn-160928a.html 8419-GPN-41538 http://www.ebrd.com/work-with-us/procurement/pn-66380.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160920a.html 8414-GPN-45358 http://www.ebrd.com/work-with-us/procurement/p-pn-160922a.html 8416-GPN-45213 http://www.ebrd.com/work-with-us/procurement/p-pn-160916a.html 8411-IFT-43597 http://www.ebrd.com/work-with-us/procurement/p-pn-160912b.html 8407-IFT-47809 http://www.ebrd.com/work-with-us/procurement/p-pn-160909a.html 8405-IFT-45956 http://www.ebrd.com/work-with-us/procurement/pn-66218.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160908a.html 8404-GPN-46955 http://www.ebrd.com/work-with-us/procurement/pn-66029.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-37895.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160902c.html 8402-GPN-48677 http://www.ebrd.com/work-with-us/procurement/p-pn-160902b.html 8401-GPN-48296 http://www.ebrd.com/work-with-us/procurement/p-pn-160902a.html 8400-GPN-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-150116a.html 7789-GPN-42262 http://www.ebrd.com/work-with-us/procurement/pn-65878.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65877.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn160901b.html 8399-GPN-42754 http://www.ebrd.com/work-with-us/procurement/p-pn-160901a.html 8398-GPN-26764 http://www.ebrd.com/work-with-us/procurement/p-pn-160831g.html 8397-GPN-47379 http://www.ebrd.com/work-with-us/procurement/p-pn-160831d.html 8394-IFT-42086 http://www.ebrd.com/work-with-us/procurement/p-pn-160831c.html 8393-IFT-42086 http://www.ebrd.com/work-with-us/procurement/p-pn-160831a.html 8391-GPN-42421 http://www.ebrd.com/work-with-us/procurement/p-pn-160830a.html 8390-GPN-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-160824c.html 8387-IFT-41178 http://www.ebrd.com/work-with-us/procurement/pn-66055.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160822a.html 8381-GPN-44753 http://www.ebrd.com/work-with-us/procurement/p-pn-66011.html 66011 http://www.ebrd.com/work-with-us/procurement/p-pn-66012.html 66012 http://www.ebrd.com/work-with-us/procurement/pn-65935.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65994.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65920.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160811a.html 8378-IFT-42086 http://www.ebrd.com/work-with-us/procurement/pn-65725.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-63584e.html 63584 http://www.ebrd.com/work-with-us/procurement/pn-65723.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65724.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65791.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-64040.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-63450.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160805a.html 8372-GPN-48651 http://www.ebrd.com/work-with-us/procurement/p-pn-160726a.html 8365-IFT-42086 http://www.ebrd.com/work-with-us/procurement/p-pn-160725a.html 8364-GPN-48156 http://www.ebrd.com/work-with-us/procurement/pn-65692.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65660.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-47196.html 64833 http://www.ebrd.com/work-with-us/procurement/p-pn-160715a.html 8356-GPN-44637 http://www.ebrd.com/work-with-us/procurement/p-pn-160714b.html 8355-GPN-41125/48406 http://www.ebrd.com/work-with-us/procurement/pn-65622.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65530.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150212b.html 7816-GPN-44129 http://www.ebrd.com/work-with-us/procurement/p-pn-160708c.html 8351-GPN-44014 http://www.ebrd.com/work-with-us/procurement/p-pn-150929a.html 8014-GPN-45645 http://www.ebrd.com/work-with-us/procurement/pn-64970.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150324a.html 7842-GPN-42608 http://www.ebrd.com/work-with-us/procurement/p-pn-160629a.html 8343-GPN-44750 http://www.ebrd.com/work-with-us/procurement/pn-65388.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160628a.html 8341-GPN-48246 http://www.ebrd.com/work-with-us/procurement/pn-65437.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65256.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160624b.html 8337-GPN-41538 http://www.ebrd.com/work-with-us/procurement/pn-49033.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49034.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160622b.html 8335-GPN-43362 http://www.ebrd.com/work-with-us/procurement/pn-65378.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160620b.html 8332-IFT-43597 http://www.ebrd.com/work-with-us/procurement/pn-65113.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65305.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160614a.html 8330-GPN-401518 and 47949 http://www.ebrd.com/work-with-us/procurement/pn-65247.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160608b.html 8314-IFT-43283 http://www.ebrd.com/work-with-us/procurement/pn-65213.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65203.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-tunesia-design-studies-for-rehabilitation-of-wwtp.html 62983 http://www.ebrd.com/work-with-us/procurement/p-pn-160531c.html 8304-GPN-42766 http://www.ebrd.com/work-with-us/procurement/p-pn-160531a.html 8302-GPN-47949 http://www.ebrd.com/work-with-us/procurement/pn-65089.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160527g.html 8301-GPN-48261 http://www.ebrd.com/work-with-us/procurement/p-pn-160527f.html 8300-GPN-40717 http://www.ebrd.com/work-with-us/procurement/p-pn-160527e.html 8299-GPN-45088 http://www.ebrd.com/work-with-us/procurement/p-pn-160527d.html 8298-GPN-46112 http://www.ebrd.com/work-with-us/procurement/p-pn-160527a.html 8295-GPN-47283 http://www.ebrd.com/work-with-us/procurement/pn-65115.html 65115 http://www.ebrd.com/work-with-us/procurement/pn-65096.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160524d.html 8292-GPN-47857 http://www.ebrd.com/work-with-us/procurement/p-pn-160524b.html 8290-GPN-43597 http://www.ebrd.com/work-with-us/procurement/pn-65060.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-65054.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-64889.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-63373.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160510a.html 8277-GPN-47526 http://www.ebrd.com/work-with-us/procurement/pn-49383.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49381.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49377.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49379.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-64911.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-63486.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-64830.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-64364.html 64364 http://www.ebrd.com/work-with-us/procurement/pn-51951.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-64659.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-64780.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160429a.html 8259-GPN-42232 http://www.ebrd.com/work-with-us/procurement/pn-64687.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-64597.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160425a.html 8257-GPN-43283 http://www.ebrd.com/work-with-us/procurement/pn-37862.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160421b.html 8254-GPN-47658 http://www.ebrd.com/work-with-us/procurement/p-pn-160421a.html 8253-GPN-OTHER http://www.ebrd.com/work-with-us/procurement/pn-64650.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160418d.html 8250-GPN-42086 http://www.ebrd.com/work-with-us/procurement/p-pn-160415b.html 8240-GPN-47971 http://www.ebrd.com/work-with-us/procurement/p-pn-64639.html 64639 http://www.ebrd.com/work-with-us/procurement/p-pn-160413a.html 8233-GPN-42557 http://www.ebrd.com/work-with-us/procurement/p-pn-160411a.html 8231-GPN-48356 http://www.ebrd.com/work-with-us/procurement/p-pn-49554.html 49554 http://www.ebrd.com/work-with-us/procurement/pn-50082.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160401a.html 8221-GPN-45213 http://www.ebrd.com/work-with-us/procurement/pn-51657.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160330a.html 8215-GPN-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-160329a.html 8213-GPN-42809 http://www.ebrd.com/work-with-us/procurement/p-pn-160324a.html 8212-GPN-45774 http://www.ebrd.com/work-with-us/procurement/pn-51317.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-64502.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-47497.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-51281.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46610.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-48486.html 48486 http://www.ebrd.com/work-with-us/procurement/p-pn-50237.html 50237 http://www.ebrd.com/work-with-us/procurement/p-pn-50235.html 50235 http://www.ebrd.com/work-with-us/procurement/pn-51966.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160308a.html 8199-GPN-43997 http://www.ebrd.com/work-with-us/procurement/pn-47493.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160303c.html 8195-IFT-48347 http://www.ebrd.com/work-with-us/procurement/p-pn-50567.html 50567 http://www.ebrd.com/work-with-us/procurement/pn-51105.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160301a.html 8192-IFT-48064 http://www.ebrd.com/work-with-us/procurement/p-pn-160226a.html 8188-GPN-43255 http://www.ebrd.com/work-with-us/procurement/p-pn-49375.html 49375 http://www.ebrd.com/work-with-us/procurement/pn-51598.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150506a.html 7873-GPN-39311 http://www.ebrd.com/work-with-us/procurement/pn-51158.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160219b.html 8183-GPN-45810 http://www.ebrd.com/work-with-us/procurement/pn-51283.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50571.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-50189.html 50189 http://www.ebrd.com/work-with-us/procurement/p-pn-50192.html 50192 http://www.ebrd.com/work-with-us/procurement/pn-42837.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50669.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-51340.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49035.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-51175.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49904.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-51154.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160208g.html 8173-GPN-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-160208e.html 8171-IFT-43597 http://www.ebrd.com/work-with-us/procurement/pn-50087.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160205b.html 8166-GPN-45094 http://www.ebrd.com/work-with-us/procurement/p-pn-160205a.html 8165-GPN-48155 http://www.ebrd.com/work-with-us/procurement/pn-51178.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-51179.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160202d.html 8176-GPN-47829 http://www.ebrd.com/work-with-us/procurement/pn-49032.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160201a.html 8160-GPN-48047 http://www.ebrd.com/work-with-us/procurement/p-pn-160202b.html 17149 http://www.ebrd.com/work-with-us/procurement/p-pn-160128a.html 8157-GPN-40858 http://www.ebrd.com/work-with-us/procurement/p-pn-141219a.html 7774-GPN-39300 http://www.ebrd.com/work-with-us/procurement/p-pn-151007b.html 8022-GPN-47690 http://www.ebrd.com/work-with-us/procurement/p-pn-45964.html 45964 http://www.ebrd.com/work-with-us/procurement/p-pn-160125c.html 8155-GPN-43465 http://www.ebrd.com/work-with-us/procurement/p-pn-160125a.html 8153-GPN-43343 http://www.ebrd.com/work-with-us/procurement/p-pn-160121b.html 8150-GPN-45276 http://www.ebrd.com/work-with-us/procurement/p-pn-160203a.html 8164-GPN-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-160120d.html 8148-GPN-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-160120c.html 8147-GPN-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-160120b.html 8146-GPN-36826 http://www.ebrd.com/work-with-us/procurement/pn-50084.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160316f.html 8208-GPN-17149 http://www.ebrd.com/work-with-us/procurement/pn-48194.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-50555.html 50555 http://www.ebrd.com/work-with-us/procurement/p-pn-160115b.html 8142-GPN-9639 http://www.ebrd.com/work-with-us/procurement/p-pn-160115a.html 8141-GPN-17149 http://www.ebrd.com/work-with-us/procurement/pn-51013.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48466.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-160112a.html 8139-GPN-43755 http://www.ebrd.com/work-with-us/procurement/p-pn-160111d.html 8138-GPN-36651 http://www.ebrd.com/work-with-us/procurement/p-pn-160111c.html 81637- EOI-43958 http://www.ebrd.com/work-with-us/procurement/p-pn-summit-testing-service-pqq.html PUR1511/09 http://www.ebrd.com/work-with-us/procurement/pn-50929.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50811.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/public-transport-development-strategy.html 47551 http://www.ebrd.com/work-with-us/procurement/p-pn-160107a.html 8134-GPN-47495 http://www.ebrd.com/work-with-us/procurement/p-pn-160106a.html 8132-GPN-46274 http://www.ebrd.com/work-with-us/procurement/p-pn-160105d.html 8130-GPN-4807 http://www.ebrd.com/work-with-us/procurement/p-pn-160105b.html 8128-GPN-46575 http://www.ebrd.com/work-with-us/procurement/p-pn-160104c.html 8123-IFT-43253 http://www.ebrd.com/work-with-us/procurement/p-pn-151230a.html 8120-GPN-48098 http://www.ebrd.com/work-with-us/procurement/p-pn-151229c.html 8119-IFT-37560 http://www.ebrd.com/work-with-us/procurement/p-pn-151229b.html 8118-IFT-43597 http://www.ebrd.com/work-with-us/procurement/pn-50803.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151223c.html 8116-GPN-45725 http://www.ebrd.com/work-with-us/procurement/p-pn-151223b.html 8115-GPN-45787 http://www.ebrd.com/work-with-us/procurement/p-pn-151223a.html 8114-GPN-43123 http://www.ebrd.com/work-with-us/procurement/pn-50399.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50215.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49892.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49646.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50758.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50760.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50759.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50762.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49644.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50761.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151217d.html 8109-GPN-47537 http://www.ebrd.com/work-with-us/procurement/p-pn-151217c.html 8108-GPN-46279 http://www.ebrd.com/work-with-us/procurement/pn-49934.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49901.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151216c.html 8102-IFT-17149 http://www.ebrd.com/work-with-us/procurement/pn-50378.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50376.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50826.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn50194.html 50194 http://www.ebrd.com/work-with-us/procurement/p-pn-37280.html 37280 http://www.ebrd.com/work-with-us/procurement/p-pn-151211b.html 8092-IFT-46852 http://www.ebrd.com/work-with-us/procurement/p-pn-151211a.html 8091-EOI-17149 http://www.ebrd.com/work-with-us/procurement/p-pn50197.html 50197 http://www.ebrd.com/work-with-us/procurement/p-pn-151209a.html 8090-GPN-41642 http://www.ebrd.com/work-with-us/procurement/p-pn-151207a.html 8089-IFT-41847 http://www.ebrd.com/work-with-us/procurement/p-pn-151204a.html 8087-GPN-17149 http://www.ebrd.com/work-with-us/procurement/pn-49898.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151202b.html 8086-IFT-41420 http://www.ebrd.com/work-with-us/procurement/p-pn-151202a.html 8085-IFT-41420 http://www.ebrd.com/work-with-us/procurement/pn-50595.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-45340.html 45340 http://www.ebrd.com/work-with-us/procurement/p-pn-150609b.html 7928-GPN-43257 http://www.ebrd.com/work-with-us/procurement/pn-50257.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50259.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50098.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-50096.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151119c.html 8078-EOI-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-151119b.html 8077-GPN-47570 http://www.ebrd.com/work-with-us/procurement/pn-49917.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn50015.html 50015 http://www.ebrd.com/work-with-us/procurement/p-pn-48040.html 48040 http://www.ebrd.com/work-with-us/procurement/p-pn-151117b.html 8072-GPN-47458 http://www.ebrd.com/work-with-us/procurement/p-pn-151117a.html 8071-IFT-42904 http://www.ebrd.com/work-with-us/procurement/pn-50094.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151117d.html 8074-IFT-Other http://www.ebrd.com/work-with-us/procurement/p-pn-151117c.html 8073-IFT-Others http://www.ebrd.com/work-with-us/procurement/p-pn-151116a.html 8070-IFT-38878 http://www.ebrd.com/work-with-us/procurement/p-pn-151112e.html 8069-EOI-17149 http://www.ebrd.com/work-with-us/procurement/pn-49812.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151111b.html 8064-IFT-38878 http://www.ebrd.com/work-with-us/procurement/p-pn-151112c.html 8067-IFT-40753 http://www.ebrd.com/work-with-us/procurement/p-pn-151112d.html 8068-GPN-47809 http://www.ebrd.com/work-with-us/procurement/p-pn-151109d.html 8060-IFT-41420 http://www.ebrd.com/work-with-us/procurement/p-pn-151106a.html 8056-IFT-41325 http://www.ebrd.com/work-with-us/procurement/pn-49020.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn--151105a.html 8055-IFT-43597 http://www.ebrd.com/work-with-us/procurement/p-pn151104a.html 8052-GPN-46201 http://www.ebrd.com/work-with-us/procurement/p-pn-49788.html 49788 http://www.ebrd.com/work-with-us/procurement/pn-49829.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151102c.html 8050-GPN-42784 http://www.ebrd.com/work-with-us/procurement/p-pn-151102a.html 8047-EOI-43094 http://www.ebrd.com/work-with-us/procurement/pn-49909.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151029a.html 8046-GPN-43958 http://www.ebrd.com/work-with-us/procurement/p-pn-49785.html 49785 http://www.ebrd.com/work-with-us/procurement/pn-49888.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49745.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151026b.html 8045-IFT-45787 http://www.ebrd.com/work-with-us/procurement/p-pm-151026a.html 8044-GPN-45284 http://www.ebrd.com/work-with-us/procurement/pn-49824.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49723.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49726.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pm151022a.html 8033-IFT-46218 http://www.ebrd.com/work-with-us/procurement/pn-49551.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn49157.html 49157 http://www.ebrd.com/work-with-us/procurement/pn-49574.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48036.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49744.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49728.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48847.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48779.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49586.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49588.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49584.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49480.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49633.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-47735.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49632.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-49019.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-151002b.html 8018-GPN-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-49523.html 49523 http://www.ebrd.com/work-with-us/procurement/pn-49200.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-47645.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48700.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-49015.html 49015 http://www.ebrd.com/work-with-us/procurement/p-pn-150918b.html 8000-PRE-47283 http://www.ebrd.com/work-with-us/procurement/p-pn-34899-ukraine-ukatse---assistance-to-the-piu.html 34899 http://www.ebrd.com/work-with-us/procurement/pn-48769.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150917a.html 7999-IFT-41200 http://www.ebrd.com/work-with-us/procurement/p-pn-150916c.html 7998-GPN-35862 http://www.ebrd.com/work-with-us/procurement/p-pn-150916b.html 7997-IFT-43283 http://www.ebrd.com/work-with-us/procurement/p-pn-150916a.html 7996-IFT-43283 http://www.ebrd.com/work-with-us/procurement/p-pn-150911b.html 7995-IFT-40185 http://www.ebrd.com/work-with-us/procurement/p-pn-150911a.html 7994-IFT-43597 http://www.ebrd.com/work-with-us/procurement/p-pn-150909a.html 7991-IFT-39311 http://www.ebrd.com/work-with-us/procurement/p-pn-150910a.html 7993-IFT-43343 http://www.ebrd.com/work-with-us/procurement/p-pn-150909b.html 7992-IFT-39004 http://www.ebrd.com/work-with-us/procurement/p-pn-150907b.html 7990-GPN-47902 http://www.ebrd.com/work-with-us/procurement/p-pn-150907a.html 7989-GPN-47829 http://www.ebrd.com/work-with-us/procurement/p-pn-150904a.html 7988-GPN-39989 http://www.ebrd.com/work-with-us/procurement/p-pn-pur1507/19-provision-of-shipping-services-for-am.html PUR1507/19 Provision of Shipping Services for Annual Meetings 2016, 2017 & 2018 http://www.ebrd.com/work-with-us/procurement/p-pn-150901a.html 7987-IFT-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-150827a.html 7986-GPN-47460 http://www.ebrd.com/work-with-us/procurement/p-pn-belgrade-water-project-tranche-1.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48646.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150820d.html 7980-EOI-45725 http://www.ebrd.com/work-with-us/procurement/p-pn-150820c.html 7979-GPN-26764 http://www.ebrd.com/work-with-us/procurement/p-pn-150820b.html 7978-GPN-26764 http://www.ebrd.com/work-with-us/procurement/p-pn-150820a.html 7977-GPN-26764 http://www.ebrd.com/work-with-us/procurement/p-pn-150819b.html 7976-GPN-46852 http://www.ebrd.com/work-with-us/procurement/pn-46202.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150819a.html 7975-EOI-44851 http://www.ebrd.com/work-with-us/procurement/p-pn-150817a.html 7974-GPN-43030 http://www.ebrd.com/work-with-us/procurement/p-pn-150814a.html 7972-IFT-43597 http://www.ebrd.com/work-with-us/procurement/p-pn-150810c.html 7970-GPN-47283 http://www.ebrd.com/work-with-us/procurement/p-pn-150810b.html 7969-GPN-40185 http://www.ebrd.com/work-with-us/procurement/p-pn-150807b.html 7967-GPN-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-150807a.html 7966-GPN-43867 http://www.ebrd.com/work-with-us/procurement/p-pn-150810a.html 7968-GPN-38147 http://www.ebrd.com/work-with-us/procurement/pn-48182.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48180.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150805c.html 7965-GPN-47324 http://www.ebrd.com/work-with-us/procurement/pn-48810.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48170.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48771.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150803a.html 7962-R1-IFT-46489 http://www.ebrd.com/work-with-us/procurement/p-pn-150729c.html 7960-GPN-43754 http://www.ebrd.com/work-with-us/procurement/p-pn-150729b.html 7959-GPN-OTHER http://www.ebrd.com/work-with-us/procurement/pn-48113.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150723a.html 7957-GPN-41553 http://www.ebrd.com/work-with-us/procurement/pn-48659.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46024.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46930.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150722a.html 7956-GPN-39004 http://www.ebrd.com/work-with-us/procurement/p-pn-39288.html 39288 http://www.ebrd.com/work-with-us/procurement/p-pn-150717c.html 7954-EOI-45787 http://www.ebrd.com/work-with-us/procurement/p-pn-150717b.html 7953-GPN-47461 http://www.ebrd.com/work-with-us/procurement/pn-48196.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-47932.html 47932 http://www.ebrd.com/work-with-us/procurement/p-pn-150717a.html 7952-GPN-44851 http://www.ebrd.com/work-with-us/procurement/pn-48464.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48656.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-48733.html 48733 http://www.ebrd.com/work-with-us/procurement/p-pn-150713b.html 7949-GPN-47229 http://www.ebrd.com/work-with-us/procurement/p-pn-151112a.html 8065-GPN-45618 http://www.ebrd.com/work-with-us/procurement/pn-47990.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48176.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-bank-of-asia---strengthening-of-institutional-capabilities-.html 47940 http://www.ebrd.com/work-with-us/procurement/pn-48174.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48102.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-48202.html 48202 http://www.ebrd.com/work-with-us/procurement/pn-48576.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-47553.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-47555.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48320.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150630b.html 7942-OTHER-45774 http://www.ebrd.com/work-with-us/procurement/pn-47859.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-pur1506/08-anti-shatter-bomb-film-for-resident-offices.html PUR1506/08 http://www.ebrd.com/work-with-us/procurement/p-pn-45959-pavlodar-tram-project---cdp.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-140514b.html 7881-GPN-47454 http://www.ebrd.com/work-with-us/procurement/p-pn-150623c.html 7940-GPN-OTHER http://www.ebrd.com/work-with-us/procurement/p-pn-150623b.html 7939-GPN-47118 http://www.ebrd.com/work-with-us/procurement/pn-48042.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150617a.html 7935-GPN-47748 http://www.ebrd.com/work-with-us/procurement/pn-47836.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150615b.html 7934-GPN-40518 http://www.ebrd.com/work-with-us/procurement/p-pn-150615a.html 7933-GPN-44243 http://www.ebrd.com/work-with-us/procurement/p-pn-150611a.html 7932-GPN-46875 http://www.ebrd.com/work-with-us/procurement/pn-48199.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150610a.html 7930-EOI-46114 http://www.ebrd.com/work-with-us/procurement/p-pn-150608c.html 7924-GPN-45264 http://www.ebrd.com/work-with-us/procurement/pn-47538.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-pur1502/11-permanent-recruitment-psl.html PUR1502/11 http://www.ebrd.com/work-with-us/procurement/p-pn-47856.html 47856 http://www.ebrd.com/work-with-us/procurement/p-pn-47851.html 47851 http://www.ebrd.com/work-with-us/procurement/p-pn-47478.html 47478 http://www.ebrd.com/work-with-us/procurement/pn-47925.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-47831.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-48078.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150519c.html 7888-GPN-47624 http://www.ebrd.com/work-with-us/procurement/p-pn-43938-kosovo-railways.html 43938 http://www.ebrd.com/work-with-us/procurement/p-pn-43939.html 43939 http://www.ebrd.com/work-with-us/procurement/p-pn-43933-kosovo-railways.html 43933 http://www.ebrd.com/work-with-us/procurement/pn-46597.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-47634.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150515c.html 7884-GPN-45640 http://www.ebrd.com/work-with-us/procurement/p-pn-150515b.html 7883-GPN-47379 http://www.ebrd.com/work-with-us/procurement/pn-47976.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150514a.html 7880-IFT-43060 http://www.ebrd.com/work-with-us/procurement/p-pn-150513c.html 7879-GPN-39299 http://www.ebrd.com/work-with-us/procurement/p-pn-150508a.html 7875-GPN-46587 http://www.ebrd.com/work-with-us/procurement/p-pn-pristina-urban-transport---sump.html 46601 http://www.ebrd.com/work-with-us/procurement/p-pn-pristina-urban-transport---fopip.html 46600 http://www.ebrd.com/work-with-us/procurement/p-pn-150501a.html 7871-EOI-17149 http://www.ebrd.com/work-with-us/procurement/pn-47052.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150429a.html 7867-GPN-46114 http://www.ebrd.com/work-with-us/procurement/p-pn150423a.html 7863-IFT-44313 http://www.ebrd.com/work-with-us/procurement/p-pn-46029.html 46029 http://www.ebrd.com/work-with-us/procurement/pn-47194.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-46128.html 46128 http://www.ebrd.com/work-with-us/procurement/p-pn-150422a.html 7859-GPN-44067 http://www.ebrd.com/work-with-us/procurement/pn-47481.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150420c.html 7858-GPN-43283 http://www.ebrd.com/work-with-us/procurement/p-pn-150420a.html 7856-GPN-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-38243.html 47882 http://www.ebrd.com/work-with-us/procurement/p-pn-38241.html 47881 http://www.ebrd.com/work-with-us/procurement/p-pn-150417b.html 7855-GPN-42086 http://www.ebrd.com/work-with-us/procurement/p-pn-150414a.html 7852-GPN-46465 http://www.ebrd.com/work-with-us/procurement/p-pn-46020.html 46020 http://www.ebrd.com/work-with-us/procurement/p-pn-46019.html 46019 http://www.ebrd.com/work-with-us/procurement/p-pn-150408a.html 7849-GPN-42662 http://www.ebrd.com/work-with-us/procurement/pn-47248.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-47377.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150324b.html 7843-GPN-45552 http://www.ebrd.com/work-with-us/procurement/pn-47408.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150324d.html 7845-GPN-47431 http://www.ebrd.com/work-with-us/procurement/p-pn-150324c.html 7844-EOI-9639 http://www.ebrd.com/work-with-us/procurement/p-pn-150320a.html 7839-R1-EOI-42564 http://www.ebrd.com/work-with-us/procurement/p-pn-150316a.html 7837-GPN-41420 http://www.ebrd.com/work-with-us/procurement/p-pn-pitesti-urban-transport---outsourcing-of-afc.html 46851 http://www.ebrd.com/work-with-us/procurement/p-pn-galati-urban-transport-automated-fare-collection.html 44787 http://www.ebrd.com/work-with-us/procurement/pn-47156.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150310c.html 7834-GPN-42889 http://www.ebrd.com/work-with-us/procurement/p-pn-150303a.html 7830-GPN-43060 http://www.ebrd.com/work-with-us/procurement/pn-46672.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150302b.html 7829-GPN-44027 http://www.ebrd.com/work-with-us/procurement/p-pn-150302a.html 7828-GPN-42904 http://www.ebrd.com/work-with-us/procurement/p-pn-150225c.html 7825–GPN-17149 http://www.ebrd.com/work-with-us/procurement/pn-45337.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150225b.html 7824-GPN-47218 http://www.ebrd.com/work-with-us/procurement/p-pn-150220b.html 7822-GPN-41200 http://www.ebrd.com/work-with-us/procurement/p-pn-150220a.html 7821-GPN-46489 http://www.ebrd.com/work-with-us/procurement/tajikistan-road-maintenance-development-project---procurement-s.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-46247-kyzylorda-waste-management-project.html 46247 http://www.ebrd.com/work-with-us/procurement/pn-46022.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150216b.html 7820-GPN-47443 http://www.ebrd.com/work-with-us/procurement/p-pn-tajik-water-ii-khorog-project--.html 46959 http://www.ebrd.com/work-with-us/procurement/p-pn-150216a.html 7819-GPN-45987 http://www.ebrd.com/work-with-us/procurement/p-pn-150213b.html 7818-GPN-40752 http://www.ebrd.com/work-with-us/procurement/p-pn-150213a.html 7817-GPN-40753 http://www.ebrd.com/work-with-us/procurement/p-pn-150212a.html 7815-GPN-38878 http://www.ebrd.com/work-with-us/procurement/p-pn-150211a.html 7814-GPN-41578 http://www.ebrd.com/work-with-us/procurement/pn-46871.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150210b.html 7813-PRE-17149 http://www.ebrd.com/work-with-us/procurement/p-pn-150209a.html 7809-GPN-44851 http://www.ebrd.com/work-with-us/procurement/pn-45981.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-6377.html 46377 http://www.ebrd.com/work-with-us/procurement/p-pn-150206a.html 7808-GPN-40899 http://www.ebrd.com/work-with-us/procurement/p-pn-150205a.html 7807-IFT-46279 http://www.ebrd.com/work-with-us/procurement/pn-46872.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150202b.html 7801-GPN-37232 http://www.ebrd.com/work-with-us/procurement/pn-46851.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46676.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-43437.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46203.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46044.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-45893.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-kyzylorda-district-heating-.html 415 http://www.ebrd.com/work-with-us/procurement/p-pn-150122c.html 7796-GPN-42564 http://www.ebrd.com/work-with-us/procurement/p-pn-150122d.html 7797-GPN-42232 http://www.ebrd.com/work-with-us/procurement/p-pn-150122b.html 7795-EOI-45094 http://www.ebrd.com/work-with-us/procurement/p-pn-150122a.html 7794-EOI-45094 http://www.ebrd.com/work-with-us/procurement/pn-46437.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46442.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46713.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46716.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150119a.html 7791-GPN-36826 http://www.ebrd.com/work-with-us/procurement/p-pn-150120b.html 7792-GPN-9639 http://www.ebrd.com/work-with-us/procurement/p-pn-150120a.html 7790-IFT-OTHER http://www.ebrd.com/work-with-us/procurement/p-pn-43199.html 43199 http://www.ebrd.com/work-with-us/procurement/p-pn-poltava-district-heating-cdp.html 231 http://www.ebrd.com/work-with-us/procurement/p-pn-140106a.html 7783-GPN-43465 http://www.ebrd.com/work-with-us/procurement/pn-44475.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46562.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46447.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46458.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-45664.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-141222a.html 7775-GPN-36538 http://www.ebrd.com/work-with-us/procurement/pn-46325.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn141218e.html 7772-GPN-9639 http://www.ebrd.com/work-with-us/procurement/p-pn141218b.html 7769-R1-IFT-45434 http://www.ebrd.com/work-with-us/procurement/p-pn-141217c.html 7766-GPN-43343 http://www.ebrd.com/work-with-us/procurement/p-pn-141217a.html 7764-EOI-OTHER http://www.ebrd.com/work-with-us/procurement/kosovo-transmission-development-project---capacity-building.html 46432 http://www.ebrd.com/work-with-us/procurement/pn-46455.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-141209c.html 7758-GPN-45213 http://www.ebrd.com/work-with-us/procurement/pn-44808.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46188.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-141209b.html 7757-GPN-42557 http://www.ebrd.com/work-with-us/procurement/p-pn-141209a.html 7756-GPN-42218 http://www.ebrd.com/work-with-us/procurement/p-pn-bosnia-herzegovina-mi-bospo-.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-45951.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46035.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-141204a.html 7754-GPN-17149 http://www.ebrd.com/work-with-us/procurement/pn-46169.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-45810.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-44561.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-141201b.html 7752-GPN-41419 http://www.ebrd.com/work-with-us/procurement/pn-44831.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46227.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-45739.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-46074.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-prijedor-district-heating-project.html TCRS ID 46806 http://www.ebrd.com/work-with-us/procurement/pn-45629.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-150812b.html 7698-GPN-45725 http://www.ebrd.com/work-with-us/procurement/pn-regional-tcs-35215-local-currency-.html Register TCS 35215 http://www.ebrd.com/work-with-us/procurement/p-pn-director-corporate-panel.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-ebrd-register-for-experts.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-trade-factoring.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/pn-tfp-finance-experts.html NO PROCUREMENT REF http://www.ebrd.com/work-with-us/procurement/p-pn-board-nominees-register.html NO PROCUREMENT REF no. of errors: 0 []

Data

Downloaded 5 times by MikeRalphson ErinClark

To download data sign in with GitHub

Download table (as CSV) Download SQLite database (7.22 MB) Use the API

rows 10 / 983

contract_type business_sector notice_type country tender_id closing_date funding_source tender_url issue_date title project_number description procurement_ref date
Corporate goods works and services
Products and Services
Invitation for pre-qualification (CPU)
United Kingdom
18 Jan 2016   at  13:00   London
04 Jan 2016
PUR1510/21 Provision of Off site Storage and Retrieval Services to the EBRD
Invitation to Tender   Provision of Off site Storage and Retrieval Services to the EBRD   The purpose of this Invitation to Tender is to pre-qualify suppliers for the provision of Off Site Storage and Retrieval Services to the Headquarters of the European Bank for Reconstruction and Development in London. The Minimum Requirements check list is the first stage of a two stage process. Suppliers interested in this Tender process must fill in and return the Minimum Requirements check list together with the documentation requested by the 18th of January 2015 at 13:00h to Aurora Rodriguez Martin (rodrigua@ebrd.com). Suppliers that meet the Minimum Requirements (that answer YES to all questions in the check list) and provide all the documentation will be pre-qualified Suppliers and will receive the Request for Proposal Document (RFP) on the 1st of February 2015. The description of the RFP Process and the details of the service to be provided, including the timescale and the Scope of Works, is included in the RFP document that will be sent to pre-qualified Suppliers. Please read and follow carefully all of the instructions provided in the document attached (Minimum Requirements Check List and Annex A).
PUR1510/21
Consultancy Services
Municipal and environmental infrastructure
Invitation for expressions of interest (CSU)
Kazakhstan
12 Jan 2016   at  23:59   London
Not Yet Determined
22 Dec 2015
Regional Infrastructure Modernisation Programme Framework - Development of Social Support Programme in Housing and Utilities Sector
49894
The Government of Kazakhstan is committed to implementing broad economic reforms within the utilities sector. The European Bank for Reconstruction and Development ("EBRD" or the "Bank") wishes to play an important role in facilitating these reforms by providing technical assistance. The Bank now seeks to select and engage a firm or group of firms (the "Consultant") to develop concrete recommendations to be considered by the Government of Kazakhstan on most suitable social support system in the housing and utilities sector in Kazakhstan, suitable for that country (the "assignment"). The objectives of the assignment are as follows: 1. To identify deficiencies in the existing social support system for the low income population in the housing and utilities sectors; 2. Based on international and regional good practices, prepare recommendations on the legal, institutional and methodological changes of the social support system in the housing and utilities sectors; 3. Based on international best practice, the Consultant should make recommendations for the selection of an appropriate level of financial support on a country-wide level or by regions with an adjustments mechanism; 4. To assess the need for integration of information systems of various state authorities to get accurate information on household income and expenses on housing and utility services and provide recommendations; 5. To develop policies and procedures for implementation of the recommendations in a pilot project (city) and assist the city administration in the implementation process; 6. To assess the results of implementation under the pilot project (qualitative and quantitative); 7. Based on results of the pilot project, to develop recommendations for changes in national legislation and propose capacity-building of state and municipal employees to create a unified social support system in the housing and utilities sectors. For the detailed description of the tasks please refer to the terms of reference, which can be accessed through the following link: http://www.ebrd.com/documents/technical-cooporation/terms-of-reference-sshu-kazakhstan.doc Status of Selection Process: Interested firms or groups of firms are hereby invited to submit expressions of interest. Assignment Start Date and Duration: The assignment is expected to start in the first quarter of 2016 and last for up to 15 months. Maximum Cost Estimate available for the Assignment: EUR 430,000; Exclusive of VAT. The Consultant must determine whether any VAT would be chargeable on the services and the basis for that determination, without taking into consideration the special status of the Bank as an IFI and state this to the Bank in their response to the Invitation for Expressions of Interest. To the extent that a Consultant incurs input VAT on goods and services purchased in connection with the provision of services (e.g. VAT on airline ticket) which is not otherwise recoverable by the consultant from the local tax authority, the gross cost to the consultant of such expenses shall be treated as a reimbursable expense. Funding Source: It is expected that the assignment will be funded through the EBRD's Technical Cooperation Funds Programme Eligibility: There are no eligibility restrictions. Consultant Profile: Corporate services are required. The Consultant will be a firm or a group of firms with previous project experience related to successful implementation social support systems in housing and utilities sector. The Consultant’s expert team is expected to include key experts as follows: a. Key Senior Expert No 1: International Project Manager with ideally at least 5 years of previous professional experience in institutional organisation of social support system in water and district heating sectors in Kazakhstan or countries with comparable conditions to Kazakhstan. Experience of working in Russia and Baltic countries would be an advantage. b. Key Senior Expert No 2: International Institutional expert with ideally at least 5 years of previous experience in social support systems in housing and utility sector in various countries. c. Key Senior Expert No 3: International and local legal experts familiar with housing and utilities legislation, social support legislation and budgetary legislation of Kazakhstan or countries with comparable conditions to Kazakhstan. d. Key Expert No 4: International and local public finance expert with knowledge of the public finance (international is preferred but local knowledge is essential). e. Key Expert No 5: Public relations expert with experience of working on similar assignments. f. Key Expert No 6: Economist with experience of working on similar assignments. g. Key Experts No 7: (Pool of additional experts) consisting of local experts with good communication skills and evidenced technical knowledge of water supply and district heating sector. The Consultant shall engage Russian, and if, necessary Kazakh language speaking staff on their team or arrange for translation/interpretation when necessary. Submission Requirements: In order to determine the capability and experience of Consultants seeking to be shortlisted for this assignment, the information submitted should include the following: 1. Company/group of firms’ profile, organisation and staffing (max. 2-4 pages). 2. Details of previous project experience or similar assignments particularly undertaken in the previous five years, including information on contract value, contracting entity/client, project location/country, duration (mm/yy to mm/yy), expert months provided (if different from duration) , main activities, objectives. 3. CVs of key senior experts who could carry out the Assignment detailing qualifications, experience in similar assignments, particularly assignments undertaken in the previous five years, including information on contracting entity/client, project location/country, duration (mm/yy to mm/yy), expert months provided, assignment budget, main activities, objectives. 4. Completed Consultant Declaration Form and Contact Sheet, the template for which is available from the following web-link: http://www.ebrd.com/pages/workingwithus/procurement/notices/csu/contact_sheet.doc. The above information should not exceed 25 pages excluding CVs and contact sheet. The complete expression of interest (including CVs, Consultant Declaration and Contact Sheet) should be submitted, in English, electronically through e-Selection, to reach the Bank not later than the closing date and time. The expression of interest shall ideally be one file (pdf) not to exceed 4MB. EBRD Contact Person: Angela Levitsky Technical Co-operation European Bank for Reconstruction and Development Tel: + 44 20 7338 6363. e-mail: LevitskA@ebrd.com Important Notes: 1. Following this invitation for expressions of interest, a shortlist of qualified firms will be formally invited to submit proposals. Consultant selection and contracting will be subject to availability of appropriate funding. 2. The evaluation criteria are as follows: - Firm’s experience in development and implementation of social support systems for housing and utilities sector in different countries – 25 % - Qualification of Key Senior Experts – 65% - Ability to communicate in Russian or Kazakh languages – 10%
NONE
Consultancy Services
Municipal and environmental infrastructure
Invitation for expressions of interest (CSU)
Tajikistan
15 Jan 2016   at  16:00   Khujand
Early Transition Countries Fund
18 Dec 2015
Khujand Public Transport Project – Corporate Development Programme, Including Development of a City Transport Strategy
47042
Executing Agency (Client): Communal State Unitary Enterprise Trolleybus of Khujand Sulton Umarov 1, Khujand, Republic of Tajikistan   The Client Contact Person: Dododjon Gafurdjonov, Head of Transport Department City Administration of Khujand R.Nabiev Avenue 39, Khujand, Republic of Tajikistan Email: dadazhanov63@mail.ru Phone: +992 3422 60244 Fax: +992 3422 67428   The EBRD Contact Person: Olesya Kerridge Advisor, Technical Co-operation European Bank for Reconstruction and Development One Exchange Square London EC2A 2JN Tel: + 44 20 7338 6895 Email: kerridgo@ebrd.com   Project Description: The European Bank for Reconstruction and Development (the “Bank” or “EBRD”) is considering a loan of up to USD 17.5 million to the Communal State Unitary Enterprise “Trolleybus of Khujand” (the “Company”) a public transport company in the City of Khujand (the “City”). A further USD 8.5 million grant to co-finance the Project is envisaged from an international donor. The Project will finance the purchase of buses and modernization of depot facilities. In addition, the Project will provide support for the introduction of formal ticketing system in the City. The purpose of the Project is to establish a reliable passenger transportation service and create a basic public transport network in the City. In addition a new formal ticketing system based on new tariffs will be implemented. It will put emphasis on cheaper and more attractive monthly passes with a goal to reduce fare revenue leakages and offer passengers the option of changing routes without double paying. It is expected that the Project will finance the following investments: Acquisition of  buses and on-board computers for buses; Modernisation of depot facilities; and Implementation of ticketing system. The Project will also assist the Company and the City to enter into Public Service Contract (the “PSC”). Assignment Description: The Client now intends to retain a consulting company (the “Consultant”) to support operational and financial improvements to secure sustainability of the Company operations via implementation of a Financial and Operational Performance Improvement Programme, the introduction of a PSC between the Company, and the City, and the development of a Corporate Business Plan and Management Information System and City Transport Strategy (the Assignment). The selected Consultant is expected to provide the following services: Prepare a Financial and Operational Performance Improvement Programme (“FOPIP”); Develop fleet and infrastructure maintenance and repair programmes; Prepare a long-term Business Plan containing measures to increase efficiency, revenues and cost coverage and meet consumers demands and priorities; Support the implementation of a PSC; Carry out financial audit; Provide the City of Khujand with a clear Transport Strategy with the definition of the respective roles of  buses and minibuses; Review the route plan which was developed under Project Due Diligence and provide an advice on strengthening of the institutional framework for the public transport sector, including regulation of microbuses and equip the City with all necessary documentation and analysis for the development of an on-going route-tendering regime that encourages competition while enabling the City to acquire improved safety and environmental standards; Allow the City to be able to monitor effectively the quality of operators services under the Public Service Contract regime. Status of Selection Process: Interested firms or group of firms are hereby invited to submit expressions of interest. Assignment Start Date and Duration: The Assignment is expected to start in Q1 2016 and have an estimated overall duration of 28 months. Cost Estimate for the Assignment: USD 350,000 (exclusive of VAT) subject to loan signing and availability of donor funding. The Consultant must determine whether any indirect taxes/VAT are chargeable on the proposed services and state the basis for such. If any indirect taxes/VAT are payable, the Client will have to pay indirect taxes/VAT element to the services directly to the Consultant unless otherwise agreed. Funding Source: It is anticipated that the contract will be financed by ETCF. Selection and contracting is subject to loan signing and availability of funding. Eligibility: There are no eligibility restrictions. Consultant Profile: Corporate services are required. The Consultant will be a firm or a group of firms with previous project experience related to: Development and implementation of corporate development programmes of a comparable nature, scale and complexity to the Assignment; Project management of complex assignments in organisations comparable to the Client and involving multiple stakeholders. The Consultant’s expert team is expected to include key experts as follows: Key Expert No 1: Team Leader / Public Transport expert preferably with 10 years or more of previous professional experience in project management of complex assignments in organisations comparable to the Client and involving multiple stakeholders; and preferably 10 years or more of previous professional experience in the urban transport sector in countries with comparable conditions to Tajikistan; Key Expert No 2: Bus fleet and infrastructure maintenance and repairs planning expert preferably with 5  years of previous professional experience of working in similar assignments; Key Expert No 3: Corporate management and business planning, including handling human resource issues expert preferably with 5 years of working in similar assignments;  Key Expert No 4: Public Transport Planning, Modelling, Financing expert preferably with 5 years of working in similar assignments;   Key Expert No 5: Public Transport Institutional and Regulatory Frameworks expert preferably with  5 years or more of previous professional experience and knowledge of urban transport management at institutional regulatory levels; Key Expert No 6: Environmental and social expert preferably with 5 years or more of previous professional experience in the successful implementation of comparable assignments and with demonstrated knowledge of the environmental and social standards of the EBRD or other comparable institutions; Key Expert No 7:  Finance and accounting expert preferably with 5 years or more of previous professional experience in comparable assignments in the urban transport sector; Key Experts No 8: Pool of Additional Experts consisting of local experts. Non-key experts are expected to include local administrative staff. All Key Experts shall be fluent in written and spoken English. It is essential that the Consultant’s team includes experts fluent in Russian. Submission Requirements: In order to determine the capability and experience of Consultants seeking to be shortlisted, the information submitted should include the following: 1. Company/group of firms’ profile, organisation and staffing (max. 2-4 pages). 2. Details of previous project experience or similar assignments particularly undertaken in the previous five years, including information on contract value, contracting entity/client, project location/country, duration (mm/yy to mm/yy), expert months provided (if different from duration) , main activities, objectives. 3. CVs of key experts who could carry out the Assignment detailing qualifications, experience in similar assignments, particularly assignments undertaken in the previous five years, including information on contracting entity/client, project location/country, duration (mm/yy to mm/yy), expert months provided, assignment budget, main activities, objectives. 4. Completed Consultant Declaration Form and Contact Sheet, the template for which is available from the following web-link: http://www.ebrd.com/pages/workingwithus/procurement/notices/csu/contact_sheet.doc. The expression of interest shall not exceed 25 pages (excluding CVs Consultant Declaration and Contact Sheet). The complete expression of interest (including CVs, Consultant Declaration and Contact Sheet) should be submitted, in English and Russian via email (pdf) to the Client’s contact person, to reach the Client not later than the Closing Date and time (13 January 2016 at 4 pm Dushanbe time). One additional copy shall reach the Bank’s contact person by the same due date. The expression of interest shall be one file (pdf). The Client reserves the right to reject applications of firms submitting more than one file. Only if any limitation on the permissible file size is exceeded, the Consultant may split the expression of interest into further files. Important Notes: 1. Following this invitation for expressions of interest, a shortlist of qualified firms will be formally invited to submit proposals. Consultant selection and contracting will be subject to availability of funding. 2. The shortlist criteria are as follows: Firm's experience in design and implementation of corporate development programmes of a comparable nature, scale and complexity to the Assignment – 30%; Firm's experience in project management of complex assignments in organisations comparable to the Client and involving multiple stakeholders – 30%; CVs of Key Expert s 1-8 – 40%. 3. Consultants may submit expressions of interest and, if selected, be shortlisted for both Tajikistan: Khujand Public Transport Project – Procurement, Implementation Support and Contract Supervision (procurement reference 48878) and Tajikistan: Khujand Public Transport Project – Corporate Development Programme, Including Development of a City Transport Strategy (procurement reference 48876). However, a consultant will be awarded only one contract.
48876
Project goods, works and services
Transport
Invitation for tenders
Kazakhstan
04 Feb 2016   at  16:00   Local time
EBRD and the client
18 Dec 2015
Kazakhstan Temir Zholy – Local Currency Loan
46852
PROCUREMENT OF EQUIPMENT FOR MAINTENANCE AND REPAIR OF RAILWAY TRACKS OF KAZAKHSTAN This Invitation for Tenders follows the General Procurement Notice for this project which was published 18th of July 2014 and updated 18th of July 2015 on the EBRD Web Site, Procurement Opportunities (www.ebrd.com) (project No. 46852) and on the website of the JSC “National Company “Kazakhstan Temir Zholy” (“KTZ”). This Invitation for Tenders is published on EBRD Web Site www.ebrd.com, on the website of the of KTZ www.railways.kz. JSC “National Company “Kazakhstan Temir Zholy” intends using part of the proceeds of funds provided by the European Bank for Reconstruction and Development (EBRD) towards the cost of the contracts for supply of various equipment for maintenance and repair of railways of Kazakhstan. Directorate of Main Railway Network - branch of JSC “NC “KTZ” now invites sealed tenders from Suppliers for the following contracts to be funded from part of the proceeds of the funds provided by the EBRD: Lot No.1 Supply of small powered track repair equipment for Kazakhstan railways Lot No.2 Supply of emergency response equipment for Kazakhstan railways Lot No.3 Supply of lighting towers for Kazakhstan railways Lot No.4 Supply of electric sleeper tamping machine for Kazakhstan railways Lot No.5 Supply of rail joint expander for Kazakhstan railways Lot No.6 Supply of movable power stations for Kazakhstan railways Lot No.7 Supply of rail layer for rail replacement for Kazakhstan railways. Supply of the Goods is planned for II-III quarter of 2016. Detailed description of the Goods, terms of delivery and places of destination are provided in the tender documents. Tenders are invited for one or more lots.  Each lot must be priced separately.  Tenders for more than one lot may offer discounts and such discounts will be considered in the comparison of tenders. Tendering for contracts that are to be financed with the proceeds of the funds provided by the EBRD is open to firms from any country. To be qualified for the award of a contract, tenderers must satisfy the following minimum criteria: Experience as Supplier, in at least  three (3) contracts within the last three (3) years that have been successfully and substantially completed and that are similar to the proposed Goods, each with a value of at least:   Lot No.1 USD   3 200 000 Lot No.2 USD      400 000 Lot No.3 USD      100 000 Lot No.4 USD      300 000 Lot No.5 USD      600,000 Lot No.6 USD      300 000 Lot No.7 USD        90 000     Minimum average annual turnover as prime Supplier (defined as billing for Goods delivered and under delivery) over the last three (3) years (2012 – 2014) in amount equivalent to:   Lot No. 1 USD  19 000 000 Lot No. 2 USD   4 000 000 Lot No. 3 USD   1 000 000 Lot No. 4 USD   3 000 000 Lot No. 5 USD   6 000 000 Lot No. 6 USD   3 000 000 Lot No. 7 USD      900 000         Lot No. 1 USD   3 200 000   Lot No. 2 USD      400 000   Lot No .3 USD      100 000   Lot No. 4 USD      300 000   Lot No. 5 USD      600,000   Lot No. 6 USD      300 000   Lot No. 7 USD        90 000     If the offered goods are not ready-made, but have to be manufactured - access to or availability of financial resources (such as liquid assets, unencumbered real assets, lines of credit and other financial means) to meet the cash-flow requirements for the relevant lot/ contract in the amounts not less than the equivalent of:           Manufacturer’s Authorization for the offered equipment in case the tenderer is not its manufacturer or producer. Manufacturers of equipment shall have successful experience in manufacturing of the offered or previous models of equipment at least within the last five (5) years and should demonstrate that the offered or previous models of equipment are/were successfully used in Kazakhstan or other countries with similar climatic conditions.  Other requirements listed in the tender documents. If a tender is submitted for two or more lots, the qualification requirements shall be summed up accordingly and the tenderer shall demonstrate that they meet the cumulative requirements for all lots the tender is submitted for. Tender documents may be downloaded free of charge from KTZ website: www.railways.kz,  or obtained at the address below upon written request.      All tenders must be accompanied by a tender security of in a form of a bank guarantee or in other form prescribed by the tender documents, in US dollars or local currency in the equivalent amounts specified below:   Lot № 1 Lot № 2 Lot № 3  Lot № 4 Lot № 5 Lot № 6 Lot № 7 USD 80 000 USD 10 000 USD   3 000 USD   8 000 USD 15 000 USD   7 000 USD   2 000   Tenders must be delivered to the office at the address below on or before 4 February  2016, 4p.m. Astana time, at which time they will be opened in the presence of those tenderers’ representatives who choose to attend. Prospective tenderers may obtain further information from the following office: CONTACTS KTZ Procurement Division Mr. Aset K. Оkasov, Head Division  6, Kunaev street, room 413 Astana 010000 Kazakhstan Telephone: +7 7172 6064 23 Facsimile number: +7 7172 60 64 12    e-mail:  Okasov_a@railways.kz These tendering opportunities are funded from the EBRD loan, and tendering procedures are governed by EBRD Procurement Policies and Rules.  
8112-IFT-46852
Project goods, works and services
Transport
Invitation for tenders
Kazakhstan
10 Feb 2016   at  16:00   Local Time
EBRD and the client
18 Dec 2015
Kazakhstan Temir Zholy – Local Currency Loan
46852
Procurement of Drilling Rigs, Truck Laboratories, Tractors, Emergency Response Trucks, Hydraulic Platforms and Cranes for Railways of Republic of Kazakhstan This Invitation for Tenders follows the General Procurement Notice for this project which was published 18th of July 2014 and updated 18th of July 2015 on the EBRD Web Site, Procurement Opportunities (www.ebrd.com) (project No. 46852) and on the website of the JSC “National Company “Kazakhstan Temir Zholy” (“KTZ”). This Invitation for Tenders is published on EBRD Web Site www.ebrd.com, on the website of the of KTZ www.railways.kz. JSC “National Company “Kazakhstan Temir Zholy” intends using part of the proceeds of funds provided by the European Bank for Reconstruction and Development (EBRD) towards the cost of the contracts for supply of various equipment for maintenance and repair of railways of Kazakhstan. Directorate of Main Railway Network - branch of JSC “NC “KTZ” now invites sealed tenders from Suppliers for the following contracts to be funded from part of the proceeds of the funds provided by the EBRD: Lot No.1 Supply of 4 Drilling Rigs for Kazakhstan railways Lot No.2 Supply of 4 Truck Laboratories for Kazakhstan railways Lot No.3 Supply of 5 Tractors for Kazakhstan railways Lot No.4 Supply of 13 Emergency Response Trucks for Kazakhstan railways Lot No.5 Supply of 4 Diesel Emergency Response Trucks for Kazakhstan railways Lot No.6 Supply of 4 Hydraulic Platforms for Kazakhstan railways Lot No.7 Supply of 4 Cranes for Kazakhstan railways. Supply of the Goods is planned for II – III quarter of 2016. Detailed description of the Goods, terms of delivery and places of destination are provided in the tender documents. Tenders are invited for one or more lots.  Each lot must be priced separately.  Tenders for more than one lot may offer discounts and such discounts will be considered in the comparison of tenders. Tendering for contracts that are to be financed with the proceeds of the funds provided by the EBRD is open to firms from any country. To be qualified for the award of a contract, tenderers must satisfy the following minimum criteria: Experience as Supplier, in at least  three (3) contracts within the last three (3) years that have been successfully and substantially completed and that are similar to the proposed Goods, each with a value of at least:   Lot No. 1 USD   160 000 Lot No. 2 USD   190 000 Lot No. 3 USD     90 000 Lot No. 4 USD   100 000 Lot No. 5 USD     80 000 Lot No. 6 USD   290 000 Lot No. 7 USD   300 000       Minimum average annual turnover as prime Supplier (defined as billing for Goods delivered and under delivery) over the last three (3) years (2012 – 2014) in amount equivalent to:   Lot No. 1 USD     1 100 000 Lot No. 2 USD     1 200 000 Lot No .3 USD        550 000 Lot No. 4 USD        600 000 Lot No. 5 USD        500 000 Lot No. 6 USD     1 800 000 Lot No  7. USD     2 000 000       Tenderer must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet the following cash-flow requirement for the relevant lot/ contract:   Lot №.1 USD   150 000 Lot №.2 USD   170 000 Lot №.3 USD     80 000 Lot №.4 USD     90 000 Lot №.5 Lot №.6 Lot №.7 USD     70 000 USD   250 000 USD   270 000       Manufacturer’s Authorization for the offered equipment in case the tenderer is not its manufacturer or producer. Manufacturers of equipment shall have successful experience in manufacturing of the offered or previous models of equipment at least within the last five (5) years and should demonstrate that the offered or previous models of equipment are/were successfully used in Kazakhstan or other countries with similar climatic conditions.  Other requirements listed in the tender documents. If a tender is submitted for two or more lots, the qualification requirements shall be summed up accordingly and the tenderer shall demonstrate that they meet the cumulative requirements for all lots the tender is submitted for. Tender documents may be downloaded free of charge from KTZ website: www.railways.kz,  or obtained at the address below upon written request.      All tenders must be accompanied by a tender security of in a form of a bank guarantee or in other form prescribed by the tender documents, in US dollars or local currency in the equivalent amounts specified below:   Lot № 1 Lot № 2 Lot № 3  Lot № 4 Lot № 5 Lot № 6 Lot № 7 USD   4 000 USD   4 700 USD   2 100 USD   2 400 USD   1 900 USD   7 000 USD   7 700   Tenders must be delivered to the office at the address below on or before 10 February 2016, 4p.m. Astana time, at which time they will be opened in the presence of those tenderers’ representatives who choose to attend. Prospective tenderers may obtain further information from the following office: CONTACTS KTZ Procurement Division Mr. Aset K. Оkasov, Head Division  6, Kunaev street, room 413 Astana 010000 Kazakhstan Telephone: +7 7172 6064 23 Facsimile number: +7 7172 60 64 12    e-mail:  Okasov_a@railways.kz These tendering opportunities are funded from the EBRD loan, and tendering procedures are governed by EBRD Procurement Policies and Rules.  
8111-IFT-46852
Consultancy Services
Municipal and environmental infrastructure
Invitation for expressions of interest (CSU)
Tajikistan
15 Jan 2016   at  16:00   Khujand
Early Transition Countries Fund
18 Dec 2015
Khujand Public Transport Project – Pre-shipment Inspection of Buses
47042
Executing Agency (Client): Communal State Unitary Enterprise Trolleybus of Khujand Sulton Umarov 1, Khujand, Republic of Tajikistan   The Client Contact Person: Dododjon Gafurdjonov, Head of Transport Department City Administration of Khujand R.Nabiev Avenue 39, Khujand, Republic of Tajikistan Email: dadazhanov63@mail.ru Phone: +992 3422 60244 Fax: +992 3422 67428   The EBRD Contact Person: Olesya Kerridge Advisor, Technical Co-operation European Bank for Reconstruction and Development One Exchange Square London EC2A 2JN Tel: + 44 20 7338 6895 Email: kerridgo@ebrd.com   Project Description: The European Bank for Reconstruction and Development (the “Bank” or “EBRD”) is considering a loan of up to USD 17.5 million to the Communal State Unitary Enterprise “Trolleybus of Khujand” (the “Company”) a public transport company in the City of Khujand (the “City”). A further USD 8.5 million grant to co-finance the Project is envisaged from an international donor. The Project will finance the purchase of buses and modernization of depot facilities. In addition, the Project will provide support for the introduction of formal ticketing system in the City. The purpose of the Project is to establish a reliable passenger transportation service and create a basic public transport network in the City. In addition a new formal ticketing system based on new tariffs will be implemented. It will put emphasis on cheaper and more attractive monthly passes with a goal to reduce fare revenue leakages and offer passengers the option of changing routes without double paying. It is expected that the Project will finance the following investments: Acquisition of  buses and on-board computers for buses; Modernisation of depot facilities; and Implementation of ticketing system. The Project will also assist the Company and the City to enter into public service contract (the “PSC”). Assignment Description: The Client now intends to retain a consulting company (the “Consultant”) to have support in the examination of the tender documents, the winning tenderer’s proposal and the Contract for Supply of buses (the “Contract”), including delivery schedule (the “Assignment”). The expected outcome of the Assignment is the full compliance of the buses financed from the proceeds of EBRD loan to the contract technical specifications and relevant international standards. The selected Consultant is expected to provide the following services: Examine the tender documents, the winning tenderer’s proposal and the Contract for Supply of buses (the “Contract”), including the delivery schedule. It is expected that buses will be delivered in up to 4 shipments during up to 10 months from the Contract signing or during up to 5 months from the first delivery date. Based on the book of orders and the available capacity at the bus assembly plant the Consultant will comment on the delivery schedule of the Contract. Develop and agree with the Company and EBRD a methodology for the pre-shipment inspection of buses to be carried out in accordance with the agreed delivery schedule stipulated in the Contract. Visit the manufacturer’s bus assembly plant and report to the Company copying to the Bank, on the manufacturer’s capacity to produce buses in accordance with tender requirements and the Contract. This will include assessment of practices and methods used to assemble chassis, construct body frame, mount and install all major components, electrical equipment and installation, etc.  The Consultant will assess and report on compatibility of the actual assembly and installation works with maintenance and repair manuals, and spare part catalogues. Collect all relevant certificates and confirm their validity for all components used in assembly of buses under the Contract, including quality of steel, plywood, plastics and other materials used for body frame, storage and supply, flooring, passenger seats, internal and external panels, wiring, etc.; and also confirm and record compliance with the technical specifications, relevant international standards and certificates as required in the tender documents and the Contract. Report on any systematic deviations, deficiencies or practices used in the assembly of the buses that will have or may have a negative effect on quality of the buses and their maintenance in the future. Visit the assembly plant at a very early start of assembly of the buses and assess the quality of works and the compliance of the assembled buses to the technical and functional specifications as stipulated in the tender documents and the Contract. Inspect each bus separately prior to shipment and provide the Company and Bank with a detailed report on its compliance to the tender documents and the Contract. Inform the Company and the Bank within two working days in writing about any deviation, deficiency or non-compliance of the buses and, as required, draft a letter to be sent to the manufacturer stipulating precise deficiencies to be remedied and repaired before a second inspection. Draft a letter to be sent by the Company to the manufacturer regarding the acceptance of the buses for shipment. Assess technical capabilities of the Company’s staff to inspect, maintain and repair buses in line with good standards and provide the Bank with recommendation for their necessary training. The description of training should include the number of staff for each training course, duration and estimated budget. Status of Selection Process: Interested firms or groups of firms are hereby invited to submit expressions of interest. Assignment Start Date and Duration: The Assignment is expected to start in Q1 2016 and have an estimated overall duration of 10 months. Cost Estimate for the Assignment: USD 90,000.00 (exclusive of VAT) subject to loan signing and availability of donor funding. The Consultant must determine whether any indirect taxes/VAT are chargeable on the proposed services and state the basis for such. If any indirect taxes/VAT are payable, the Client will have to pay indirect taxes/VAT element to the services directly to the Consultant unless otherwise agreed. Funding Source: It is anticipated that the contract will be financed by ETCF. Selection and contracting is subject to loan signing and availability of donor funding. Eligibility: There are no eligibility restrictions. Consultant Profile: Corporate services are required. The Consultant will be a firm or a group of firms with preferably previous project experience related to: Provision of independent pre-shipment inspection for the supply of public transport vehicles, preferably city buses. Projects involving the procurement policies and rules of international financial institutions (such as the EBRD, World Bank or equivalent).  The Consultant’s expert team is expected to include key experts as follows: Key Expert No 1 – Expert for diesel systems for vehicles with preferably 5 years of experience in the relevant field and knowledge of the latest bus technologies and diesel vehicles. Key Expert No 2 – Bus Mechanic Expert with preferably 5 years’ experience in latest bus technologies and conducting pre-shipment inspection of the public transport vehicles including buses.  Non-key experts are expected to include local administrative staff. All Key Experts shall be fluent in written and spoken English. It is essential that the Consultant’s team includes experts fluent in Russian. Submission Requirements: In order to determine the capability and experience of consultants seeking to be selected, the information submitted should include the following: 1. Company/group of firms’ profile, organisation and staffing (max. 2-4 pages). 2. Details of previous project experience or similar assignments particularly undertaken preferably in the previous five years, including information on contract value, contracting entity/client, project location/country, duration (mm/yy to mm/yy), expert months provided (if different from duration) , main activities, objectives. 3. CVs of key experts who could carry out the Assignment detailing qualifications, experience in similar assignments, particularly assignments undertaken in the previous five years, including information on contracting entity/client, project location/country, duration (mm/yy to mm/yy), expert months provided, assignment budget, main activities, objectives. 4. Completed Consultant Declaration Form and Contact Sheet, the template for which is available from the following web-link: http://www.ebrd.com/pages/workingwithus/procurement/notices/csu/contact_sheet.doc. The expression of interest shall not exceed 25 pages (excluding CVs Consultant Declaration and Contact Sheet). The complete expression of interest (including CVs, Consultant Declaration and Contact Sheet) should be submitted, in English and Russian via email (pdf) to the Client’s contact person, to reach the Client not later than the Closing Date and time. One additional copy shall reach the Bank’s contact person by the same due date and time. The expression of interest shall be one file (pdf). The Client reserves the right to reject applications of firms submitting more than one file. Only if any limitation on the permissible file size is exceeded, the Consultant may split the expression of interest into further files. Important Notes: Note 1. The selection will normally be made from responses to this notification only. Consultants will not be asked to submit a proposal. The highest-ranked Consultant will be selected from a shortlist and be invited to negotiate the contract, subject to availability of funding. Note 2. The shortlist criteria are as follows: Firm’s experience in provision of independent pre-shipment inspection for the supply of public transport vehicles, preferably city buses - 30%; Firm’s experience in projects involving the procurement policies and rules of international financial institutions (such as the EBRD, World Bank or equivalent) – 30%;  CVs of Key Experts No 1 and 2 – 40%.
50070
Project goods, works and services
Municipal and environmental infrastructure
Invitation for tenders
Romania
09 Feb 2016   at  11:00   Local time
EBRD
18 Dec 2015
Water Co-Financing Framework (R2CF) – Valcea Sub-Project
43082
Water Co-Financing Framework (R2CF) – Valcea Sub-Project INVITATION FOR TENDERS Construction of four Micro-Hydro power Plants in Stan Valley, Vladesti Valley and Ramnicu Valcea (I and II)   This Invitation for Tenders follows the General Procurement Notice for this project which was initially published on the EBRD website, Procurement Notices (www.ebrd.com) on 12 February 2013 and republished on 14 October 2015. SC APAVIL SA hereinafter referred to as “the Employer”, intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development (the Bank) towards the cost of Water Co-Financing Framework (R2CF) – Valcea Sub-Project. The Employer now invites sealed tenders from contractors for the following contract to be funded from part of the proceeds of the loan: Construction of Hydro Power Plant Stan Valley SHP "Valea lui Stan" - in platform raw water treatment plant transported from headrace Bradisor in Valea lui Stan  Construction of Hydro Power Plant in Vladesti Valley SHP Vladesti - immediately downstream of the dam access road to the accumulation Vladesti (left bank) Construction of Hydro Power Plant in Ramnicu Valcea SHP "water plant Ramnicu Valcea" - located on the relevant platform Drinking Water Processing Plant of Ramnicu Valcea Construction of Hydro Power Plant in Ramnicu Valcea II Ramnicu Valcea Hydropower - located in the area bordering the lake dam Ramnicu Valcea, on land owned by SC APAVIL S.A. Tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms from any country.       This tender is subject to EBRD Procurement Policies and Rules. The latest version of the EBRD Procurement Policies and Rules is available at the following website: http://www.ebrd.com/work-with-us/procurement/policies-and-rules.html To be qualified for the award of a contract, tenderers must satisfy the following minimum criteria: Minimum average annual turnover of ten million Euro (EUR 10 Million) calculated as total certified payments received for contracts in progress or completed, within the last three (3) years. Experience under contracts in the role of contractor or management contractor for the last five (5) years prior to the tender submission deadline, and with activity in at least nine (9) months in each year. Participation as prime contractor or management contractor in at least two (2) contracts within the last five (5) years , each with a value of at least three point two million Euro (EUR 3.2 million), that have been successfully and substantially completed and that are similar to the proposed Works. The similarity shall be based on the physical size, complexity, methods/technology or other characteristics as described in Section VI, Employer’s Requirements. For the above or other contracts executed during the period stipulated in 2.4.2(a) above, a minimum experience in the following key activities: At minimum each contract shall consist in design and build of at least two (2) micro hydro power plants with the cumulated minimum output of 1.5 MW. A valid SR EN ISO 9001 and SR EN ISO 14001 certificates, issued by a reputable accredited independent organization or similar documentation. Tender documents in electronic version only can be downloaded free of charge from the following website: www.apavil.ro. (http://www.apavil.ro/index.php/companie/achizitii/achzitii-publice). Technical Project can be obtained free of charge in electronic format (on DVD) or on paper for the amount of: 244 Romanian Lei (RON) without TVA, at the address shown below. On request, the documents will be promptly dispatched by a courier firms, payment on delivery. The Employer will be not responsible for any delay or loss of documents. All tenders must be accompanied by a tender security of EUR 280,000.00 or its equivalent in a convertible currency or in Romanian Lei (RON).   Tenders must be delivered to the office at the address below on or before 09 February 2016 11.00 hours – local time, at which time they will be opened in the presence of those tenderers’ representatives who choose to attend.   A register of potential tenderers who have purchased the tender documents may be inspected at the address below. Prospective tenderers may obtain further information from, and inspect and acquire the tender documents at, the following office:   SC Apavil SA Ramnicu Valcea   Birou Unitate Implementare Proiecte Name: Mr.Darie Nicolae Address: 3-5 Carol I street, 240539, Ramnicu Valcea, Romania Tel: +40 250739580 Fax:  +40 250 738 903 e-mail: nicu.darie@apavil.ro  
8110-IFT-43082
Project goods, works and services
Municipal and environmental infrastructure
Invitation for tenders
Kazakhstan
01 Feb 2016   at  15:00   Almaty Time
EBRD
17 Dec 2015
Kyzylorda CNG Bus
45264
Procurement of Public Transport Service planning software system and related services   This Invitation for Tenders follows the General Procurement Notice for this project which was published on the EBRD website, Procurement Notices (www.ebrd.com ) on 18 December 2013 and updated on 8 June 2015. Municipal state-owned enterprise Avtobusnyi Park Kyzylorda LLP hereinafter referred to as “the Purchaser”, intends to use part of the proceeds of a loan from the European Bank for Reconstruction and Development (the Bank) towards the cost of Kyzylorda CNG Bus Project. The Purchaser now invites sealed tenders from Suppliers for the following contracts to be funded from part of the proceeds of the loan: Package #KCBP03 - Procurement of Public Transport Service planning software system and related services. Tendering for contracts that are to be financed with the proceeds of a loan from the Bank is open to firms from any country. To be qualified for the award of a contract, tenderers must satisfy the following minimum criteria: a)         Tenderers shall meet the eligibility requirements: no conflicts of interests, not having been declared ineligible by the Bank, compliance with requirements of tender documents for government owned entity if a tenderer is owned by the government, not having been excluded as a result of the Borrower’s country laws or by an act of compliance with UN Security Council resolution. b)         In the case of a tenderer offering to supply goods under the Contract which the tenderer does not manufacture, the tenderer has been duly authorised by the goods’ manufacturer to supply the goods in the Purchaser’s country in accordance with the requirements of the Tender documents. c)         Non-performance of a contract did not occur within the last 3 (three) years, based on all information on fully settled disputes or litigation. All pending litigation shall in total not represent more than 20% (twenty percent) of the Tenderer’s net worth. d)         The audited balance sheets for the last 3 (three) years must demonstrate the soundness of the Tenderer’s financial position, including profitable result of economic activities in each of the last 3 years e)         Minimum average annual turnover of USD 500,000 (five hundred thousand) or its equivalent, calculated as total certified payments received for contracts in progress or completed, within the last 3 (three) years. f)          The Tenderer shall demonstrate that it has access to, or has available, liquid assets sufficient to meet the production cash flow for the contract estimated as not less than 80 per cent of the planned contract amount, taking into account the Tenderer's commitments for other contracts. g)         A Tenderer shall have a successful general and special experience as a Supplier of software packages for the public transport services planning similar to those requested in the tender documents for at least three companies over the past 5 years. Software packages for monitoring of public transport only, will not count as a reference. h)         The Tenderer or its agent will be able to carry out the supplier’s maintenance, repair and spare parts stocking obligations in the Purchaser country. i)          Capabilities and experience of manufacturers: the software offered shall be manufactured serially for no less than 3 years. Tender documents may be obtained from the office at the address below upon payment of a non-refundable fee of 100,000 (one hundred thousand) Kazakhstan tenge, including VAT, or equivalent in a convertible currency by exchange rate of National Bank of Kazakhstan on the date of payment. Payment of a nonrefundable fee is to be made by bank transfer to: Currency: KZT Beneficiary: Avtobusnyi Park Kyzylorda LLP Account No: KZ756010201000188567 BIN: 991240003820 Bank: АО «Народный Банк Казахстана» (JSC Halyk Bank), Kyzylorda BIC/SWIFT: HSBKKZKX Currency: USD Beneficiary: Avtobusnyi Park Kyzylorda LLP Account No: KZ916010201000188570 Beneficiary's Bank: JSC Halyk Bank, 109 “v” Abay ave., 050008 Almaty, Kazakhstan SWIFT: HSBKKZKXXXX Bank Correspondent: The Bank of New York Mellon, New York, USA SWIFT: IRVTUS3NXXX Beneficiary's Bank Account No: 8900372605 Upon receiving appropriate evidence of payment of the non-refundable fee, the documents will be promptly dispatched by courier, however, no liability can be accepted for loss or late delivery. If requested the documents can also be dispatched electronically after the presentation by the prospective tenderer of appropriate evidence of payment of the non-refundable fee. In the event of discrepancy between electronic and hard copies of the documents, the hard copy shall prevail. All tenders must be accompanied by a tender security as follows: 6,000 (six thousand) USD or its equivalent in a convertible currency. Unless otherwise indicated, these tendering opportunities are funded from and EBRD loan, and tendering procedures are governed by EBRD Procurement Policies and Rules. Tenders must be delivered to the office at the address below on or before 15:00 (local time) 1 February 2016 at which time they will be opened in the presence of those tenderers’ representatives who choose to attend. A register of potential tenderers who have purchased the tender documents may be inspected at the address below. Prospective tenderers may obtain further information from, and also inspect and acquire the tender documents at, the following office:   Mr. Serik Iskendirovich Sarsenov Consultant of Avtobusnyi Park Kyzylorda LLP Mr. Zhanbolat Turmaganbetov Director of the Investor Service Centre JSC NC SPK Baikonur Avtobusnyi Park Kyzylorda LLP via JSC NC SPK Baikonur 1 floor, office 182,  Business centre «Bastau», 42, str. Zheltoksan, Kyzylorda, 120014, Republic of Kazakhstan Tel./Fax:           +7 (724) 2 605 144 e-mail: avtopark_kd@mail.ru  
8107-IFT-45264
Project goods, works and services
Power and energy
Invitation for expressions of interest (loan or grant funded)
Morocco
27 Jan 2016   at  09:00   Local Time
EBRD
16 Dec 2015
ONEE Hydro Rehabilitation Project
47379
Consultant for the Project Preparation and Implementation Unit (PPIU)   The Invitation for Expression of Interest follows the General Procurement Notice for this project published in Procurement Opportunities, on the EBRD website 15 May 2015.   ONEE was created in 2012 as a result of a merger between Office National de l’Electricité, the state-owned national electricity utility, and the Office National de l’Eau Potable, the state-owned national water utility. ONEE is responsible for providing both electricity and water to its customers.   ONEE intends using the proceeds of EBRD loan towards the cost of ONEE Hydro Rehabilitation Project. This notice relates to engagement of the Project Preparation and Implementation Unit (PPIU) Consultant.   The main objective of the PPIU Consultant is to provide organizational and technical assistance to the Client to ensure the successful completion of the Project in accordance with the Project Implementation Plan (PIP) and with all the Bank’ requirements stipulated in the Loan Agreement.   The proposed project, which has a total estimated cost of about EUR 40 Mln will be financed by EBRD loan proceeds. The Project consists of the major maintenance or overhaul of several hydro power plants and dams and will require the procurement of the following goods, works and services (tentative list):   Supply and Installation of Plant and Equipment for:   El Kansera (2x9 MW): rehabilitation of the two generators; Imfout HPP (2x15.5 MW): replacement of two Kaplan turbines; Taurart (2x1 MW): necessary rehabilitation after flooding; Bou-Areg (1x6.4 MW):rehabilitation of ancillary equipment and installation of SCADA; Taza (2x 320 kW): rehabilitation of ancillary equipment and installation of SCADA;; Bin El Ouidane dam and Ait Ouarda dam: overhaul of hydro- and electro-mechanical equipment and civil works Rehabilitation of Imfout Dam Spillway and Ancillary Equipment Douarat (17MW) Overhaul of intake valves Rehabilitation Works of 6 Small Hydropower Plants Maaser (0,1MW), Fes Aval (0,945MW), Sefrou (0,260MW), Tabant (0,068MW), Maachou (24MW) et Talambot (14,2MW) (to be done after completed study)   The following Technical Assistance funded through Technical Cooperation (grant money) will be done: Study to improve the operation mode of Afourer complex Study of the production potential of the Moroccan HPPs including impact of climate change Assessment of the grid capacity to absorb renewable energy   The principal objective of this assignment is to deliver assistance to ONEE’s PIU during Project preparation and implementation. The Consultant will assist PIU with the following tasks:   TASK 1:          Project Preparation Phase Development of Project Implementation Unit (PIU) operating procedures Inspection of hydroelectric plants Support during the procurement process: (i) preparation of tender documents, (ii) procurement of the works, goods and services, (iii) tender evaluation process, and (iv) contract finalisation and award: Diagnostic and study for the rehabilitation of the 6 small hydro power plants (SHPP) : Maaser (0,1MW), Fes Aval (0,945MW), Sefrou (0,260MW), Tabant (0,068MW), Maachou (24MW) et Talambot (14,2MW) ; Diagnostic and study for the rehabilitation of 4 dams (Imfout, Douarat, Maachou and Talambot/Ali Thailat)   TASK II:         Project Implementation Phase Reviewing site preparation including engineering supervision arrangement; Monitoring, supervision, and reporting on the implementation of contracts and overall completion of each Project component; Validation of project documents Monitor the contractors’ program for performance as well as documentation for required tests and commissioning in accordance with contract conditions; Control of execution of works Assistance in the implementation of the Environmental and Social Action Plan (ESAP); Testing, Commissioning and Operational Acceptance Follow up of the punch list during the defect liability period Knowledge transfer to Client   TASK III:       Project Completion Project completion report Project documentation   Status of Selection Process: Interested firms are hereby invited to submit expressions of interest.   Assignment expected start date and duration: The assignment is expected to take place from April 2016 and is expected to be carried out over a 48-month period. The input of the experts is expected to be intermittent during this period (detailed schedule to be agreed upon between the Client and the Consultant).    Maximum Budget available for the Assignment: EUR 1,800,000 (exclusive of VAT).   The consultant must determine whether any VAT would be chargeable on the services and the basis for that determination, without taking into consideration the Bank's special status as an IFI and state this to the Bank and CGES in their response to the Invitation for Expressions of Interest. To the extent that a consultant incurs input VAT on goods and services purchased in connection with the provision of services (e.g. VAT on airline ticket) which is not otherwise recoverable by the consultant from the local tax authority, the gross cost to the consultant of such expenses shall be treated as a reimbursable expense.   Funding Source: Through EBRD loan proceeds.   Eligibility Restrictions: There are no eligibility restrictions.   Consultant Profile: An international firm of consultants will be engaged for this assignment and is expected to procure the services of a multidisciplinary team of both international and local experts as appropriate.    The Consultant is expected to have relevant expertise and experience the procurement and implementation of hydropower construction and rehabilitation projects. In addition, relevant experience in the EBRD’s countries of operation would be an advantage.   The Consultant is expected to provide a team of experts with necessary qualification and skills to deliver the above-mentioned services timely and within budget. The Consultant team is expected to comprise the following key experts:   The Team Leader (TL) shall be an Engineer with at least 10 years’ experience in construction or rehabilitation of hydropower plants including dams. The TL should have led projects in the past similar to the project under this Contract. The TL shall possess excellent knowledge of French and English language for coordination and report writing purposes. Hydro-mechanical Engineer with at least 10 years of experience in planning, design and construction of hydropower plants projects. Electro-mechanical Engineer with at least 10 years of experience in planning, design and construction of hydropower plants projects. Civil Engineer with at least 10 years of experience in planning, design and construction of hydropower plants projects Expert Hydrology with at least 10 years of experience in planning, design and construction of dams and hydropower plants similar to the projects. Procurement Expert with at least 10 years of procurement experience in power projects including construction or rehabilitation of hydropower plants including dams as well as the relevant experience to work with an IFI.   Short Term Experts with at least 10 years’ experience in the following areas of work: SCADA (Supervisory Control and Data Acquisition; Factory acceptance tests and Commissioning for similar assets; Protection and Control Measures; Civil Works in the field of substation and tower foundations construction; Environmental and Social Measures.   Local Experts (as required) with at least 5 years’ proven experience in OHL engineering and Substation Engineering; Civil Engineering; Dam Engineering; Social and Environmental; Site Supervision.   Note that intermittent inputs are expected from the key experts. The Consultant should propose a suitable organisation staffing with anticipated input (man-months) from the key experts in a staffing schedule and work plan. The proposed Experts need to have appropriate skills in both French and English language.   The above information should not exceed 10 pages excluding CVs.   One original and two numbered hard copies together with electronic copy on CD-Rom of the above information in French and English should be submitted to the Client in an envelope marked “Expression of Interest for ONEE Rehabilitation Project: PPIU Consultancy Services”, to reach the Client not later than the above closing date.   Contact Details:   Mme Bouchra ABDERRAHIM et Mlle Mounia BELGHITI ONEE-Branche Electricité 65, Rue Othmane Bnou Affane Casablanca MAROC Emails: abderrahim@onee.ma , m.belghiti@onee.ma Fax: Bouchra ABDERRAHIM  Fax 00212 5 22 66 86 79 Fax: Mounia BELGHITI           Fax 00212 5 22 66 86 79     Notes: Following this invitation for expressions of interest, a shortlist of qualified firms will be formally invited to submit proposals. Shortlisting, selection and contracting will be subject to the availability of funding.   Expression of Interest shall be submitted before 27/01/2016 at 9h00am (Moroccan time) at ONEE-BE headquarters, Direction Approvisionnements et Marchés, sis 65, rue Othman Ben Affan, Casablanca
8106-EOI-47379
Project goods, works and services
Municipal and environmental infrastructure
Invitation for tenders
Kazakhstan
09 Feb 2016   at  11:00   Almaty Time
EBRD, GOK
16 Dec 2015
Almaty Street Lighting
45640
    INVITATION FOR TENDERS Supply and Installation of LED lighting system in Almaty ALA/LED/1 This Invitation for Tenders follows the General Procurement Notice for this project which was published in Procurement Opportunities, 15 May 2015.   State Communal Enterprise on the Rights of Economic Administration of the Almaty city Akimat (SCE on REA) “Almaty Kala Zharyk”, (the Employer), has received a loan from the European Bank for Reconstruction and Development (the Bank) towards the cost of Almaty Street Lighting Project.   The Employer now invites sealed tenders from contractors for Design, Supply and Installation of LED lighting system in Almaty, hereinafter referred to as “the Contract”, to be funded from the proceeds of the loan.   The scope of works shall include Design, Supply and Installation of LED lighting system in Almaty, including 5 years full Performance Warranty (which includes replacement of the defective luminaries and compensation of the costs for replacement), in one single contract, with the subject matter comprising of the items specified in the Tender Documents’’.   Total number of luminaries to be replaced is 76000.   To be qualified for the award of a contract, tenderers must substantially satisfy the following minimum qualification requirements:             The tenderer shall have an average annual turnover (defined as annual earnings, expressed in its equivalent of a defined currency) as a contractor over the last 3 (three) years of USD 51,000,000 equivalent.   The tenderer shall meet the following minimum criteria:    successful experience as a contractor (prime or subcontractor) in the execution within the last 10 (ten) years of at least 2 (two) contracts for the supply and installation of at least 10000 street lighting luminaries each. The referenced contracts shall not necessarily imply LED luminaries;   successful experience as a designer of street lighting LED system with at least 70000 (seventy thousand) luminaries. successful experience as a contractor (prime or subcontractor) in the execution of at least 2 (two) contracts of energy-efficient street lighting modernisation within the last 10 (ten) years.  successful experience as a contractor (prime or subcontractor) in the execution of at least 1 (one) contract within the last 5 (five) years of the street lighting retrofit by supply and installation of at least 5000 street lighting luminaries, performed in similar operating and technical conditions to those prevailing in Kazakhstan.   In addition, the tenderer shall demonstrate experience in installation of at least 6000 luminaries/month.   The tenderer shall provide suitably qualified personnel, as follows: Project Manager with a total work experience of minimum 7 (seven) years, at least 5 (five) of which in similar works and at least 3 (three) years as manager of similar works; Chief Designer; Electrical Power Engineer; Traffic Management Expert; Health and Safety Expert, each with a total work experience of minimum 5 (five) years, at least 3 (three) of which in similar works and at least 2 (two) years as manager of similar works; Utilities Coordination and Permitting Expert with a total work experience of minimum 3 (three) years, at least 2 (two) of which in similar works and at least 1 (one) year as manager of similar works.   Availability or proposals of timely acquisition (through hire, lease, purchase agreement, availability of manufacturing equipment, or other means), as minimum, of 10 units of Bucket trucks/manlift devices (min. 10 m reach/working height) and 10 sets of Temporary traffic control/management devices and/or vehicles. Equipment shall not be older than five (5) years and have proper certifications, where applicable.    Availability of liquid assets, unencumbered real assets, lines of credit, and other financial means sufficient to meet the construction cash flow for the contract for a period of 12 months, estimated as not less than USD 7,000,000 equivalent, taking into account the tenderer's commitments in other contracts.   Joint ventures and Consortiums consisting of two and more partners must satisfy collectively all the above mentioned qualification criteria, for which purpose the relevant figures for each of the partners shall be added to arrive at the joint venture's total capacity;   The tenderer’s subcontractors shall demonstrate successful experience as a contractor (prime or subcontractor) in the execution of at least 1 (one) contract of a magnitude comparable to the works proposed for subcontracting within the last 5 (five) years;   The manufacturer(s) shall meet the following minimum criteria: have manufactured at least 150000 units of LED street luminaries annually; have manufacturing capacity/assembly lines to produce 20000 LED luminaries/months during 12 months of the planned Contract implementation period (except 2 months for production and delivery), taking into account the tenderer's commitments in other contracts.   Tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms from all countries. The proceeds of the Bank’s loan will not be used for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations. Tender documents may be obtained from the address below upon written request to the  Employer: A two stage tender procedure will be adopted and will proceed as follows: (a)        the First Stage tender will consist of a technical proposal only, without any reference to prices, and a list of any deviations to the technical and commercial conditions set forth in the tender documents or any alternative technical solutions a tenderer wishes to offer, and a justification therefor, provided always that such deviations or alternative solutions do not change the basic objectives of the project. Following evaluation by the Employer of the First Stage tenders, the Employer will invite each tenderer who meets the qualification criteria and who has submitted a technically responsive tender to a clarification meeting.  The proposals of all such tenderers will be reviewed at the meeting and all required amendments, additions, deletions and other adjustments will be noted and recorded in a Memorandum.  Only qualified tenderers submitting a technically responsive and acceptable First Stage tender will be invited to submit a Second Stage tender.   (b)        the Second Stage tender will consist of an updated technical tender incorporating all changes required by the Employer as recorded in the Memorandum to the clarification meeting or as necessary to reflect any amendments to the tender documents issued subsequent to submission of the First Stage tender; and the commercial tender.   First Stage tenders must be delivered to the address below on or before 11:00 a.m. Almaty time, 9 February 2016 at which time they will be opened in the presence of the tenderers’ representatives who wish to attend.   All Second Stage tenders must be accompanied by a Tender Security of USD 1,100,000 (one million one hundred thousand USD Dollars) or its equivalent in a convertible currency, and must be delivered to the address below on or before the time and date of the submission deadline specified in the Letter of Invitation to submit Second Stage tenders, at which time they will be opened in the presence of the tenderers’ representatives who wish to attend.   A register of potential tenderers may be inspected at the address below.   Prospective tenderers may obtain further information from, and inspect and acquire the tender documents at, the following office: Mr. Yuri Machkovski Chairman Enterprise on the Rights of Economic Administration of Almaty city Akimat (SCE on REA) “Almaty Kala Zharyk” 101 Г, Ryskulov street, Almaty 050058, Kazakhstan  Tel/Fax: +7 727 3017812; +7 727 2530563 Email address: almatyled@gmail.com      
8100-IFT-45640

Statistics

Average successful run time: about 1 hour

Total run time: 15 days

Total cpu time used: about 13 hours

Total disk space used: 7.33 MB

History

  • Auto ran revision 3e83d954 and completed successfully .
    615 records added, 611 records removed in the database
    719 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    613 records added, 610 records removed in the database
    720 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    616 records added, 616 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    616 records added, 616 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    616 records added, 616 records removed in the database
    722 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    617 records added, 596 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    608 records added, 606 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    715 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    715 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    606 records added, 606 records removed in the database
    712 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    606 records added, 600 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    52 records added, 52 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    605 records added, 604 records removed in the database
    713 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    605 records added, 604 records removed in the database
    712 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    604 records added, 604 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    604 records added, 604 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    606 records added, 603 records removed in the database
    713 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    604 records added, 601 records removed in the database
    711 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    603 records added, 593 records removed in the database
    709 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    707 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    704 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    595 records added, 593 records removed in the database
    699 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    594 records added, 594 records removed in the database
    693 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    593 records added, 589 records removed in the database
    698 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    591 records added, 587 records removed in the database
    697 pages scraped
  • Auto ran revision 3e83d954 and failed .
    409 records added, 409 records removed in the database
    516 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    591 records added, 591 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    591 records added, 589 records removed in the database
    694 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    589 records added, 585 records removed in the database
    696 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    589 records added, 588 records removed in the database
    694 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    589 records added, 584 records removed in the database
    692 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    587 records added, 585 records removed in the database
    689 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    585 records added, 585 records removed in the database
    689 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    585 records added, 585 records removed in the database
    687 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    585 records added, 585 records removed in the database
    690 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    585 records added, 584 records removed in the database
    689 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    585 records added, 579 records removed in the database
    687 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    581 records added, 581 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    582 records added, 578 records removed in the database
    686 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    581 records added, 571 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    572 records added, 568 records removed in the database
    670 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    673 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    570 records added, 567 records removed in the database
    675 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    568 records added, 568 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    568 records added, 568 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    569 records added, 568 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    570 records added, 570 records removed in the database
    673 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    569 records added, 569 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    569 records added, 568 records removed in the database
    672 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    572 records added, 569 records removed in the database
    672 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    675 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    573 records added, 573 records removed in the database
    676 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    575 records added, 570 records removed in the database
    678 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    572 records added, 569 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    569 records added, 568 records removed in the database
    671 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    570 records added, 569 records removed in the database
    667 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    571 records added, 571 records removed in the database
    673 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    571 records added, 570 records removed in the database
    676 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    570 records added, 566 records removed in the database
    671 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    677 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    678 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    571 records added, 571 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    574 records added, 573 records removed in the database
    677 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    575 records added, 575 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    575 records added, 575 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    576 records added, 575 records removed in the database
    679 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    577 records added, 577 records removed in the database
    680 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    578 records added, 574 records removed in the database
    679 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    577 records added, 577 records removed in the database
    680 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    581 records added, 581 records removed in the database
    686 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    582 records added, 582 records removed in the database
    684 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    577 records added, 574 records removed in the database
    687 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    581 records added, 580 records removed in the database
    683 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    582 records added, 581 records removed in the database
    688 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    584 records added, 581 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    584 records added, 584 records removed in the database
    689 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    584 records added, 583 records removed in the database
    686 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    377 records added, 373 records removed in the database
    479 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    580 records added, 576 records removed in the database
    683 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    472 records added, 472 records removed in the database
    578 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    577 records added, 577 records removed in the database
    683 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    580 records added, 573 records removed in the database
    684 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    686 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    574 records added, 574 records removed in the database
    678 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    574 records added, 572 records removed in the database
    676 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    572 records added, 565 records removed in the database
    675 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    568 records added, 567 records removed in the database
    673 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    569 records added, 569 records removed in the database
    673 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    569 records added, 569 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    569 records added, 567 records removed in the database
    672 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    564 records added, 557 records removed in the database
    668 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    669 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    563 records added, 554 records removed in the database
    666 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    667 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    660 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    661 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    557 records added, 553 records removed in the database
    660 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    660 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    653 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    676 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    660 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    556 records added, 484 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    nothing changed in the database
    659 pages scraped
  • Auto ran revision 3e83d954 and failed .
    nothing changed in the database
    1 page scraped
  • Auto ran revision 3e83d954 and completed successfully .
    536 records added, 534 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    538 records added, 537 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    537 records added, 537 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    538 records added, 537 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    539 records added, 539 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    539 records added, 531 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    198 records added, 198 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    534 records added, 531 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    534 records added, 534 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    534 records added, 534 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    536 records added, 532 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    533 records added, 532 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    538 records added, 534 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    385 records added, 382 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    538 records added, 536 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    537 records added, 537 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    540 records added, 540 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    381 records added, 373 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    534 records added, 534 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    534 records added, 533 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    533 records added, 526 records removed in the database
  • Auto ran revision 3e83d954 and failed .
    nothing changed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    534 records added, 534 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    534 records added, 534 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    535 records added, 531 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    537 records added, 532 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    335 records added, 334 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    535 records added, 535 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    536 records added, 531 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    382 records added, 382 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    534 records added, 534 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    534 records added, 534 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    536 records added, 530 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    450 records added, 450 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    401 records added, 401 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    98 records added, 93 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    532 records added, 529 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    529 records added, 529 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    425 records added, 421 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    527 records added, 527 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    529 records added, 517 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    519 records added, 515 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    461 records added, 461 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    336 records added, 336 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    519 records added, 519 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    521 records added, 520 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    521 records added, 517 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    411 records added, 411 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    521 records added, 519 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    515 records added, 513 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    498 records added, 496 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    515 records added, 515 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    515 records added, 514 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    361 records added, 358 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    517 records added, 517 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    523 records added, 518 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    519 records added, 511 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    511 records added, 511 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    509 records added, 509 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    512 records added, 512 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    509 records added, 501 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    509 records added, 503 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    215 records added, 215 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    484 records added, 484 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    503 records added, 501 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    503 records added, 503 records removed in the database
  • Auto ran revision 3e83d954 and completed successfully .
    503 records added, 501 records removed in the database
    601 pages scraped
  • Auto ran revision 3e83d954 and completed successfully .
    501 records added, 495 records removed in the database
    599 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    494 records added, 494 records removed in the database
    593 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    495 records added, 492 records removed in the database
    593 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    493 records added, 487 records removed in the database
    590 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    490 records added, 488 records removed in the database
    587 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    490 records added, 490 records removed in the database
    587 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    491 records added, 489 records removed in the database
    588 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    489 records added, 489 records removed in the database
    586 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    489 records added, 481 records removed in the database
    586 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    486 records added, 484 records removed in the database
    583 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    486 records added, 486 records removed in the database
    583 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    487 records added, 487 records removed in the database
    584 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    487 records added, 487 records removed in the database
    584 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    487 records added, 487 records removed in the database
    584 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    487 records added, 486 records removed in the database
    584 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    127 records added, 125 records removed in the database
    187 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    385 records added, 385 records removed in the database
    471 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    485 records added, 481 records removed in the database
    582 pages scraped
  • Auto ran revision 12d74366 and failed .
    174 records added, 174 records removed in the database
    275 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    483 records added, 483 records removed in the database
    579 pages scraped
  • Auto ran revision 12d74366 and completed successfully .
    483 records added, 481 records removed in the database
    579 pages scraped
  • Manually ran revision 12d74366 and completed successfully .
    545 records added in the database
    581 pages scraped
  • Manually ran revision 12d74366 and completed successfully .
    484 records added, 484 records removed in the database
    581 pages scraped
  • Auto ran revision 6a33615f and failed .
    280 records added, 279 records removed in the database
    378 pages scraped
  • Auto ran revision 6a33615f and completed successfully .
    486 records added, 486 records removed in the database
    583 pages scraped
  • Auto ran revision 6a33615f and completed successfully .
    486 records added, 483 records removed in the database
    583 pages scraped
  • Auto ran revision 6a33615f and completed successfully .
    484 records added, 483 records removed in the database
    580 pages scraped
  • Auto ran revision 6a33615f and completed successfully .
    484 records added, 482 records removed in the database
    580 pages scraped
  • Auto ran revision 6a33615f and completed successfully .
    484 records added, 484 records removed in the database
    580 pages scraped
  • Auto ran revision 6a33615f and completed successfully .
    484 records added, 480 records removed in the database
    580 pages scraped
  • Auto ran revision 6a33615f and completed successfully .
    480 records added, 477 records removed in the database
    576 pages scraped
  • Manually ran revision 6a33615f and completed successfully .
    479 records added, 479 records removed in the database
    575 pages scraped
  • Auto ran revision 40f50896 and failed .
    202 records added, 202 records removed in the database
    299 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    479 records added, 477 records removed in the database
    575 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    479 records added, 477 records removed in the database
    575 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    478 records added, 478 records removed in the database
    574 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    478 records added, 478 records removed in the database
    574 pages scraped
  • Auto ran revision 40f50896 and failed .
    19 records added, 17 records removed in the database
    116 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    476 records added, 471 records removed in the database
    572 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    471 records added, 468 records removed in the database
    568 pages scraped
  • Auto ran revision 40f50896 and failed .
    nothing changed in the database
    96 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    477 records added, 476 records removed in the database
    573 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    476 records added, 476 records removed in the database
    572 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    476 records added, 476 records removed in the database
    572 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    476 records added, 476 records removed in the database
    572 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    476 records added, 469 records removed in the database
    548 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    469 records added, 467 records removed in the database
    564 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    469 records added, 469 records removed in the database
    564 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    472 records added, 471 records removed in the database
    567 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    472 records added, 472 records removed in the database
    567 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    473 records added, 473 records removed in the database
    568 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    473 records added, 469 records removed in the database
    569 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    469 records added, 467 records removed in the database
    564 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    467 records added, 464 records removed in the database
    562 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    466 records added, 460 records removed in the database
    562 pages scraped
  • Auto ran revision 40f50896 and completed successfully .
    461 records added, 459 records removed in the database
    555 pages scraped
  • Auto ran revision 40f50896 and failed .
    nothing changed in the database
    53 pages scraped
  • Manually ran revision 40f50896 and completed successfully .
    461 records added, 461 records removed in the database
    555 pages scraped
  • Manually ran revision 40f50896 and failed .
    461 records added, 384 records removed, 28 records updated in the database
    555 pages scraped
  • Auto ran revision 93a39f95 and failed .
    nothing changed in the database
    94 pages scraped
  • Manually ran revision 93a39f95 and failed .
    nothing changed in the database
    94 pages scraped
  • Manually ran revision 93a39f95 and failed .
    nothing changed in the database
    94 pages scraped
  • Auto ran revision 6c85171e and failed .
    nothing changed in the database
    94 pages scraped
  • Manually ran revision 871541e4 and completed successfully .
    412 records added, 175 records removed in the database
    502 pages scraped
  • Manually ran revision bdc872aa and failed .
    54 records added, 54 records removed in the database
    130 pages scraped
  • Manually ran revision ed85b88a and failed .
    31 records added, 31 records removed in the database
    105 pages scraped
  • Manually ran revision fe2f6da9 and failed .
    166 records added, 166 records removed in the database
    239 pages scraped
  • Manually ran revision 46ba633a and completed successfully .
    175 records added, 111 records removed in the database
    241 pages scraped
  • Manually ran revision a3c805f7 and failed .
    111 records added in the database
    177 pages scraped
  • Manually ran revision a3c805f7 and failed .
    111 records added in the database
    178 pages scraped
  • Manually ran revision a3c805f7 and failed .
    111 records added, 8 records removed in the database
    177 pages scraped
  • Manually ran revision fcc4e4b7 and failed .
  • Manually ran revision 6c5e2fc1 and failed .
    8 records added in the database
    56 pages scraped
  • Manually ran revision 0c9d49ca and failed .
    nothing changed in the database
  • Created on morph.io

Scraper code

Python

td_EBRD / scraper.py